1.
Study on Approaching Construction of Two-Tube Shield Tunnels by Centrifuge Model Test;
双孔盾构隧道近接施工离心模型试验研究
2.
Technology of Treatment of Pile Foundations Intruding into Shield Tunnel by means of Manual-cut Borehole Method
侵入盾构隧道桩基人工挖孔处理技术
3.
Study on the Influence Degree of Adjacent Construction of Three Parralell Shield Tunnels;
三孔并行盾构隧道近接施工的影响度研究
4.
The Mechanics Behavior Analysis in Approaching Construction of Two Parallel Shield Tunnels;
两孔平行盾构隧道近接施工的力学行为分析
5.
Research on Internal Forces Computational Methods for DOT Shield-Driven Tunnel Lining;
双圆盾构隧道衬砌结构内力计算方法研究
6.
Research on Influences of Dubble-Tube Shield Tunneling on Deformation of Upper Exisiting Structures
双线盾构隧道穿越对既有结构变形的影响研究
7.
Analysis and calculation of superimposed load induced by double parallel shield tunnelling
双线平行盾构法隧道施工附加荷载的计算分析
8.
Numerical Modeling Study on Interaction between Twin Shields Tunneling
双线盾构隧道施工过程相互影响的数值研究
9.
FLAC~(3D) Numerical Simulation of Surface Subsidence and Adjacent Rock Deforming Caused by Backfill Grouting in Double-Tube Shield Tunnel with Small Spacing
小间距双线盾构隧道壁后注浆对地表及围岩变形的FLAC~(3D)数值模拟
10.
The Importance of Double-liquid Grouting Resynchronization in Shield Tunneling Construction
二次同步注双液浆技术在盾构法隧道施工中的应用
11.
Waterproofing and sealing of shield tail and sealing grease
盾构法隧道的盾尾防水密封与盾尾密封油脂
12.
And it is used successfully in shield tunneling, horizontal drilling, deep drilling, slotted walls and bore piles construction projects.
主要应用于盾构隧道挖掘,水平钻孔,深层钻孔,开凿围墙和钻桩的建筑项目。
13.
Tunneling Techniques of Open Cut in close quarters for Step Over a Existing Shield Tunneling
明挖法隧道近距离跨越既有盾构隧道施工技术
14.
Study on seismic responses of connectional passages for a shield tunnel
盾构隧道联络通道地震响应规律研究
15.
Study on Environmental Effects and Structural Performance of Shield Tunnel;
盾构隧道的环境效应及结构性能研究
16.
Shield Tunneling Influence on Strip Foundation Frame Structure
盾构隧道穿越条基框架结构影响研究
17.
Safety Evaluation for Existing Shield Tunnel Lining Structure
既有盾构隧道衬砌结构的安全性评估
18.
Prevention on Shield Leakage for Shield Machine with Large Diameter in Long Distance Cross-river Tunnel Construction
大直径长距离过江隧道盾构机盾尾泄漏的防治