1.
Aerial platform--Classification
GB/T9465.1-1988高空作业车分类
2.
mobile stone crushing and screening plant
碎石和筛选联合作业车
3.
tanker operation
水罐车作业水罐车供水
4.
Duration of lane change operation
变换车道作业的延时
5.
flow method of vehicle maintenance
汽车维护流水作业法
6.
method of vehicle maintenance on universal post
汽车维护定位作业法
7.
The operating standard for railway shunting--Railway shunting the operating standard for the train detaching and attaching
GB/T7178.7-1996铁路调车作业标准铁路调车列车摘挂作业标准
8.
The operating standard for railway shunting--Railway shunting the operating standard for sorting trains
GB/T7178.6-1996铁路调车作业标准铁路调车编组列车作业标准
9.
The operating standard for railway shunting--Railway shunting the operating standard for standing wagons
GB/T7178.9-1996铁路调车作业标准铁路调车停留车作业标准
10.
The operating standard for railway shunting--Railway shunting the operating standard for taking out and placing in wagons
GB/T7178.8-1996铁路调车作业标准铁路调车取送车辆作业标准
11.
Study on Logistics Cost Control Based on Activity in Finished Vehicle Entreprice;
商品汽车物流企业作业成本控制研究
12.
The operating standard for railway shunting--Railway shunting the standard for preparing operatio
GB/T7178.2-1996铁路调车作业标准铁路调车准备作业标准
13.
The operating standard for railway shunting--Railway shunting the operating standard for the shunting neck
GB/T7178.5-1996铁路调车作业标准铁路调车平面牵出线作业标准
14.
The operating standard for railway shunting--Railway shunting the operating standard for the simple hump
GB/T7178.4-1996铁路调车作业标准铁路调车简易驼峰作业标准
15.
The operating standard for railway shunting--Railway shunting the operating standard for the mechanized hump
GB/T7178.3-1996铁路调车作业标准铁路调车机械(半自动)化驼峰作业标准
16.
The operating standard for railway shunting--Railway shunting basic regulations for the operating standard
GB/T7178.1-1996铁路调车作业标准铁路调车作业标准基本规定
17.
hump technological interval
驼峰技术作业间隔(即列车推峰作业周期)
18.
Hazards Analysis of Working Conditions in Forklift Work Area for Acrylic Fiber Production
腈纶生产叉车作业区的作业条件危险性分析