说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 台山核电
1.
Forecasting the Environmental Effect on Draining Water to Marine Environment of the Taishan Nuclear Power;
台山核电工程温排水对海洋环境影响预测
2.
The Preventive and Treatment Technique for Cracks of Autoclaved Concrete Building Blocks Wall
台山核电南生活区蒸压加气混凝土砌块墙体防裂施工
3.
A New Technology of Nuclear Emergency Electronic Accountibility System
秦山第三核电厂核应急电子清点系统
4.
nuclear electronic instrument for geological-mining
地质矿山核电子仪器
5.
I have a mountain bike, an electric guitar, and a computer.
我有一辆山地车,一把电吉他,一台电脑。
6.
Sa: (to Jonah) you called the radion station?
山:(对乔那)你打电话给电台了?
7.
Now vice head of Guangdong Taishan Broadcasting and TV Station.
从事电视新闻工作16年,现任广东省台山市广播电视台副台长。
8.
Development of Block-Based Logic Diagram and Analog Diagram Design Platform
核电站LD/AD模块化设计平台开发
9.
Virtual Electronic Workbench Based on Pspice Core
以Pspice为内核的虚拟电子工作平台
10.
Testing and Operation of Nuclear Air-Cleaning Systems in Qinshan NPP
秦山核电厂核空气净化系统试验与运行
11.
Sa: Tell them about the radio show. Go, go ahead.
山:告诉他们电台的事,去,说吧。
12.
Transformer Biasing Analysis and Limitation in Taishan Power Plant
台山电厂变压器直流偏磁研究与防治
13.
Designed and established the 300,000-KW Qinshan Nuclear Power Station;
设计并建造了30万千瓦的秦山核电站;
14.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
15.
Design of Neutron Source Assembly for Qinshan Phase II NPP Project
秦山核电二期工程反应堆中子源设计
16.
A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project
秦山三期(重水堆)核电站工程进展概况
17.
The Research of Process Control for NPQJVC Phase II Extension Project;
秦山核电二期扩建工程进度控制研究
18.
Shandong Nuclear Power Company Compensation System Construction & Research
山东核电有限公司薪酬体系建设研究