1.
Three-Dimensional Numerical Simulation in Rectangular Secondary Sedimentation Tanks Based on CFD;
基于CFD的平流式二沉池三维数值模拟
2.
Research on Improving the Flow Pattern and the Sedimentation Effect of the Rectangular Secondary Sedimentation Tank Basedon FLUENT Simulation and Fluidization Visualization Experiments;
基于FLUENT模拟及流态可视化实验验证的平流式二沉池流态及沉淀效果改善研究
3.
Two-Dimensional Numerical Simulation of the Two-Phase Flow in Rectanangular Secondary Settling Tanks
平流二次沉淀池两相流二维数值模拟
4.
Experimental Simulation on Flow Pattern of Modified Horizontal Sedimentation Tank
改良型平流式沉淀池流态的实验模拟
5.
The chlorinator pipe reforming of horizontal flow tank in No.4 water factory in Pingdingshan
平顶山市第四水厂平流式沉淀池加氯管改造
6.
Two-Dimensions Numerical Simulation of the Soiid-Liquid Two-Phase Flow in Rectangular Secondary Settling Tanks;
平流二次沉淀池的二维固液两相流数值模拟研究
7.
Numerical Simulation Study of Rectangular Settling Tanks in Waterworks;
给水处理厂平流式沉淀池的数值模拟研究
8.
Research on Settling Performance of Activated Sludge in Rectangular Sedimentation Tank;
活性污泥在平流式沉淀池中的沉淀行为规律研究
9.
The Modelling Design of Horizontal Flow Presettling Basin Using for Water Lifting Project Located in Baotou Segment of Huanho
黄河包头画匠营子取水工程平流式预沉池模型设计
10.
The Three-dimensional Finite Element Analysis of Horizontal-flow Tank RC Structure;
平流式沉淀池钢筋混凝土结构的三维有限元分析
11.
A TEST OF CONTINUOUS SEDIMENTATION - STUDY ON THE SETTLING PERFORMANCE IN A SECONDARY CLARIFIER
连续流沉淀试验——二次沉淀池运行工况的研究
12.
Experimental Investigation and Numerical Simulation on Flow Pattern of Horizontal Sedimentation Tank;
平流沉淀池流态的试验研究和数值模拟
13.
The balance analysis of the sludge blanket height for wangxiaoying wastewater treatment plant in hefei
合肥市王小郢污水处理厂二沉池泥位平衡分析
14.
THREE-DIMENSIONAL SIMULATION OF SOLID-LIQUID TWO-PHASE FLOW IN A CIRCULAR SECONDARY CLARIFIER
辐流式沉淀池固液两相流三维数值模拟
15.
The Hydraulic Calculation of Water Distribution System of the Peripheral-feed Peripheral-overflow Settling Tank
周进周出辐流式沉淀池配水系统水力计算
16.
The hydraulic calculation of perforated outlet pipe of secondary sedimentation thank has been presented in this paper.
主要介绍了二次沉淀池淹没式穿孔出水管的水力计算方法。
17.
APPLICATION OF ADVECTION PRECIPITATE POND IN WASTEWATER TREATMENT SYSTEM IN BENGANG NEW SINTER SHOP
平流沉淀池在本钢新烧车间浊环水系统中的应用
18.
Study on Vertical Dissolved Air Flotation Tank to Improve Secondary Effluent of Wastewater Treatment Plant
竖流式溶气气浮池提高二级出水水质的研究