1.
The Method Study on Wire Bonding Process Continuous Improve with DMAIC;
焊线工序持续改进的DMAIC方法研究
2.
Automatical EB Welding of Curved Weldment
工件平面曲线焊缝的电子束自动焊接
3.
Automatic Welding Procedure in Pipeline Construction of India East to West Gas Project
印度“东气西输”工程管线施工自动焊焊接工艺
4.
Selection of Domestic Welding Wire for Argo Arc Welding in Application of Carbon Steel Pipeline in Petro-chemical Industry
石油化工碳钢管线氩弧焊用国产焊丝的选择
5.
Submerged arc welding procedures of large-scale intersection and modeling of welding gun gesture
大型相贯线埋弧焊接工艺研究及焊枪姿态建模
6.
Application of STT root welding in the second WEPP(West-East Pipeline Project)
STT根焊在西气东输二线管道焊接工程中的应用
7.
Root welding process of low hydrogen electrode in the Second West-East Gas Transmission Pipeline Project
西气东输二线工程中的低氢焊条根焊技术
8.
Welding technology in winter of West to East Gas Pipeline Project Ⅱ
西气东输二线工程冬季施工焊接技术
9.
Code for construction and acceptance of welding aluminium-bus-bar
铝母线焊接施工及验收规范
10.
Study on Welding Technology and Reliability of X80 Pipeline Steel;
X80管线钢焊接工艺及可靠性研究
11.
The Study on Operation Performance of Self-shielded Flux Cored Wire Used in X80 Pipeline Steel
X80管线钢用自保护药芯焊丝工艺研究
12.
Welding Process Research of K60 Pipeline Steel in the Low-temperature Environment
低温环境下K60管线钢焊接工艺研究
13.
Temperature control of construction of West-East Gas Transmission Pipeline No.2 in winter
西气东输二线冬季施工焊接温度控制
14.
radio procedure
无线电通信工作程序
15.
Effect of Hot Rolling and Cooling Schedule on the Microstructure of Welding Rod Steel;
热加工冷却工艺对焊线钢显微组织的影响
16.
Technique Research on welding "H" type longeron;
大型焊接工字梁车架生产线的工艺研究
17.
Research on X80 Pipeline Steel Semi-automatic Welding for West to East Gas Pipeline Ⅱ Project
西气东输二线工程X80钢管半自动焊工艺研究
18.
Standard for inspection and measurement with ray photographing for metal melting weld seam of building installation engineering
建筑安装工程金属熔化焊焊缝射线照相检测标准