1.
Determining Rational Completion Cable Forces of Cable-stayed Bridges Based on Comprehensive Method
基于综合方法的斜拉桥合理成桥索力确定
2.
Researches on Reasonable Tensile Force and Design Parameters of Single-Pylon Cable-Stayed Bridge;
独塔斜拉桥合理成桥索力及设计参数研究
3.
Decision Method on Rational State of Accomplishment and Research on Construction Control of Long-Span Cable-Stayed Bridge;
大跨斜拉桥合理成桥状态确定及施工控制研究
4.
Analysis of Stayed Cable and Study on the Reasonable Finished State of Cable-stayed Bridge;
斜拉桥拉索的受力分析与合理成桥状态的确定
5.
Reasonable Cable Tension in Finished State of Cable-Stayed Bridges and the Control during Construction;
斜拉桥的合理成桥索力和施工阶段索力控制
6.
Determination of Reasonable Finished State and Reasonable Construction State of Special-Shaped Tied-Arch Bridge;
钢筋混凝土异型系杆拱桥合理成桥状态与合理施工状态研究
7.
Research on Comprehensive Method of Determining Reasonable Cable Forces Completion State of Bride of the Cable-Stayed Brides and the Construction Control;
确定斜拉桥合理成桥索力的综合方法与施工控制研究
8.
Determination of Rational Completion Status of Cable-Stayed Bridges by Combined Bending Energy and Stress Balance Method;
综合弯曲能量法和应力平衡法确定斜拉桥合理成桥状态
9.
Analysis of Reasonable Finished Dead State and Simulation of Construction Control of a Cable-stayed Bridge with Single Inclined Tower and Hybrid Girder;
独斜塔混合梁斜拉桥合理成桥状态分析与施工控制模拟
10.
Research of Static Performance & Reasonable Completed Bridge States of No Back-stays & Inclined Pylon Cable-stayed Bridge;
无背索斜塔斜拉桥的静力性能及合理成桥状态研究
11.
Analysis of Reasonable Finished State and Seismic Response of Concrete Cable-Stayed Bridge;
混凝土斜拉桥合理成桥状态及地震响应分析研究
12.
Research on Rational Completion State and Construction Control of Long Span Bridges Based on Influence Matrix;
基于影响矩阵的大跨桥梁合理成桥状态与施工控制研究
13.
Determination of Reasonable Finished State and Study on Some Problems for Self-anchored Cable-stayed Suspension Bridge
自锚式斜拉—悬索协作体系桥合理成桥状态确定与若干问题研究
14.
Determination of Rational Completion Hanger Force of Bowstring Arch Bridges on the Basis of Influence Matrix Method
基于影响矩阵的系杆拱桥合理成桥吊杆索力确定
15.
Comprehensive Method of Determining Reasonable Cable Forces of Completion State of Bridge of the Cable-Stayed Bridges;
斜拉桥成桥合理索力确定的综合方法
16.
Mixed Line-type Method of Main Cable under Dead Load State of Suspension Bridge
悬索桥成桥主缆线形计算的混合线形理论法
17.
Application of Subproject Contract Management in the Cost Control of Highway Bridge Construction Project;
路桥施工子项目合同管理在成本控制中的应用
18.
According to the different combination mode of joint and rock bridge, there are different cracking and perforation mode of rock bridge which lead to macro joint.
根据节理岩桥的不同组合方式,从而形成岩桥的不同破裂、通方式,进而形成宏观上的节理。