1.
Risk Dicision-making of Thermal Power Plant Investment Based on Utility Function;
基于效用函数的火电厂投资风险决策
2.
Economic Research on Investment and Operation of the Small Power Station of the Danjiangkou Project;
丹江口水利枢纽小电厂投资与运行经济研究
3.
The Feasibility Study of Ras Al Khaimah Coal-fired Power Plant's Investment Project
哈伊马角燃煤电厂投资项目的可行性研究
4.
Financial Analysis and Solution of the Eighth Extension Project of Baoding Co-generation Power Plant;
保定热电厂八期扩建工程投资财务分析与对策
5.
Analysis on Investment of WUSITAI Thermal Energy and Electric Factory in 2×150MW Project;
关于M公司乌斯太热电厂2×150MW项目的投资分析
6.
The Method of Transmission Planning and Investment in a Deregulated Environment;
网厂分开后输电网规划及其投融资模式研究
7.
Transmission Planning in a Deregulated Environment;
网厂分开后电网扩容规划及投融资模式研究
8.
Strategy of Electricity Investment Companies After the Electricity Mechanism Reform;
厂网分开、竞价上网后电力投资公司的对策
9.
On Investment Control of Waste-to-Energy Power Plant Project
浅谈垃圾焚烧发电厂项目的投资控制手段
10.
Application of Fuzzy Judgment in coal-fired Power Plant Desulfurization Item Investment Decision Making
模糊评判在燃煤电厂脱硫项目投资决策的应用
11.
Study on the Investment Recovery Mechanism of the Pumped-Storage Power Station in the Experimental Electricity Pricing System with Separation of Generation from Transmission
厂网分开体制下蓄能电站投资回收方法的探讨
12.
Various enterprises of electromechanical technology and auto spare parts manufacturers from overseas or at home are warmly welcome to make investment and establish factories.
热忱欢迎海内外机电类和汽车零部件类生产厂家来区投资办厂。
13.
expenditure on new plant and equipment
新厂房和新设备投资额
14.
Investment: RMB80 million for cemented carbide plant and 150 million for mining tool plant.
项目投资:合金厂投资8000万元,配套工具厂15000万元。
15.
The Investment Evaluation and Case Studies of Energy-saving Reform Project in Thermal Power Plant;
火电厂节能改造项目投资效益后评价及案例研究
16.
Investing in Project Engineering and Analyzing on Operation Economic Benefit of Rizhao Power Plant Units 2×350MW;
日照电厂2×350MW工程项目投资及运行经济效益分析
17.
Investment Risk Analysis for the 2*300MW Coal-Fired Units Extension Project of Shandong Huaneng Xindian Power Plant
山东华能辛店电厂扩建2*300MW燃煤机组项目投资风险分析
18.
Effects of NO_x Removal Efficiency on Investment and Operation Cost of SCR Installations
电厂烟气脱除NO_x效率对SCR装置投资及运行费用的影响