说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水电工程移民
1.
Characteristics and Countermeasures of Soil Erosion in Water and Hydropower Engineering Migrations
水利水电工程移民水土流失特点及防治对策
2.
Study on Post-evaluation of Resettlement and Rehabilitation in Water Conservancy and Hydro-power Engineering;
水利水电工程移民安置项目后评价研究
3.
Investigation Report of Emigration of Large and Middle Hydraulic and Hydroelectric Projects in Shanxi Province;
山西省大中型水利水电工程移民调查报告
4.
Reflection on water resources projects-induced resettlement in China;
我国水利水电工程移民问题分析与思考
5.
Study on Hydropower Project Resettler’s benefits mechanism and its construction
水利水电工程移民利益导向机制及其建构初探
6.
Research on Index System for Resettlement Capacity Analysis of Hydropower Project;
水电工程移民安置环境容量分析指标体系研究
7.
Revision and Improvement of Design Standard for Resettlement Planning of Hydroelectric Projects;
水电工程移民安置规划设计标准的修编改进
8.
The Research on the Rationales and Mechanisms of Immigrant Sharing the Economic Benefit of Hydroelectric Project;
水电工程移民共享经济效益的机理与机制研究
9.
Study on economic benefit-sharing mechanism for emigrant from construction of hydropower project;
基于效益共享的水电工程移民安置机制初探
10.
On the Fixation Role of the Hydropower Project Migrants in the West of China;
关于西部水电工程移民角色固着化的几点思考
11.
Discusstion and Practice of Actualized Planning of Migration Resettlement and Construction Expropriated Land of Hydroelectric Projects;
大型水电工程移民安置实施规划探索与实践
12.
Discussions on the combination of reservoir resettlements with poverty alleviation plan in the development of hydropower projects in Yunnan;
云南水电工程移民与扶贫计划相结合的探讨
13.
Discussion on status quo of resettlement management system of large and medium scale of hydropower projects;
大中型水电工程移民管理体制现状及发展探讨
14.
Analysis of the rationality of available definition method of resettlement population for hydropower projects
现行水电工程移民人口界定方法的合理性分析
15.
Study on hydropower project resettlement impact on the population in southwest ethnic areas. A case of Nujiang
西南少数民族地区大型水电工程移民人口影响研究—以怒江为例
16.
PRIMARY EXPLORATION TO THE SHAREHOLDER RESETTLEMENT MODE FOR HYDROELECTRIC PROJECT IMMIGRANTS;
水电工程农村移民入股安置模式初探
17.
A summary of land acquisition and resettlement for the construction of Xiaowan Hydropower Station;
小湾水电站工程水库建设征地移民工作综述
18.
Thinking on the Policy of Land Acquisition and Resettlement Induced by Water Resources and Hydropower Project in Property Law;
对《物权法》中水利水电工程征地移民政策的思考