1.
Distributions and Motivations of Zero Conjunction in English Written Texts;
英语书面语篇零连接分布及成因分析
2.
Work on the last section of the primary road link to Ma On Shan Town Centre is scheduled for completion in 2000.
马鞍山市中心主要连接路最后一段工程,定于二零零零年完成。
3.
Magnetic Field Shielding in End-to-end Zone of Brachy-axis-like Parts during Continuous Induction Quenching
连续感应淬火的短轴类零件首尾连接处的屏蔽
4.
This new access road will be completed by end-2003 to coincide with the completion of the third phase of the Cyberport.
这条新路将于二零零三年年底建成,连接届时落成的数码港第三期。
5.
an imaginary line connecting points on the Earth's surface where the magnetic declination is zero.
一条在地球表面上连接磁偏为零的点的假想线。
6.
A coupling device for connecting parts, such as pipes or rods.
联管街,联轴节耦合设备,用于连接零件,例如管道或连杆
7.
Within the year 2000, all of Kowloon, Tsuen Wan, Kwai Chung, Tsing Yi, Tseung Kwan O and Chai Wan will be connected up to treatment works.
在二零零零年内,九龙、荃湾、葵涌、青衣、将军澳和柴湾等地区,会全部连接至污水处理厂去。
8.
Setting the page size to zero disables page size request on this Connection Agreement.
页面大小设为零将禁用此连接协议的页面大小请求。
9.
First, connect your two computers with a cable (called a "null modem serial cable").
首先,用电缆(称为“零调制解调器串行电缆”)连接两台计算机。
10.
A conducting object, such as a wire, that is connected to such a position of zero potential.
地线一种与零电位位置相连接的传导性物体,如电线
11.
The 900-metre Tseung Kwan O Tunnel, opened in 1990, links Kowloon and Tseung Kwan O New Town.
将军澳隧道于一九九零年启用,全长900米,连接九龙与将军澳新巿镇。
12.
"Bolt: Mechanical fastener, usually used with a nut, for connecting two or more parts."
螺栓:通常与螺母一起用于连接两个或更多零件的机械紧固件。
13.
A large conducting body, such as the earth or an electric circuit connected to the earth, used as an arbitrary zero of potential.
接地大面积导体,如地面或与地面连结的电路,用做任意零电位
14.
The Shing Mun Tunnels between Sha Tin and Tsuen Wan were openedin 1990 and measure 2.6 kilometres.
连接沙田与荃湾的城门隧道于一九九零年通车,全长2.6公里。
15.
At present mainly serves domains coupling, photoelectricity, semiconductor, automobile spare part, cosmetic and so on.
目前主要服务于连接器、光电、半导体、汽车零部件、化装品等领域。
16.
A section of pipe, such as an elbow, used to connect two or more pipes.
接管零件连结两个或更多管道的管子配件,如弯管
17.
link. It is recommended that delay be used to determine link costs. A link cost of zero indicates that the two sites are not connected.
成本来定义,建议使用延迟来确定链接费用。零链接费用表示两个站点未连接。
18.
connectors, links, joins, joiners, information systems diagrams
连接线, 链接, 连接, 连接件, 信息系统图