1.
a measure used by an acquirer to gain control of a takeover target; acquirer tries to persuade other shareholders that the management of the target should be replaced.
一种接管措施;接收方试图劝说股东接管企业管理。
2.
Primary Exploration on Control of TBM Segment Displacement under Construction in the Tunnel
TBM施工中管片接缝错台控制措施初探
3.
Corrosive reasons of connecting tubes for chlorine measuring tanks and their solutions
氯气计量槽接管腐蚀原因及应对措施
4.
Reasons for Coking in the Tube Joined to the Main Oil Gas Piping Exit at Coke Tower Top and Countermeasures
焦炭塔顶大油气管线出口接管结焦原因及措施
5.
Discussed shallowly the fuel gas pipeline enters building's lightning protection and earth measure
浅谈燃气管道进入建筑物的防雷接地措施
6.
Protective Measures for Dew Point Corrosion of Bend-chamber of Direct Tubular Heater
直接管式加热炉弯头箱结露腐蚀的防治措施
7.
Analysis of Pressure Pipeline Welding Quality Control and Preventive Measures
浅析压力管道焊接过程的质量控制及预防措施
8.
precautionary management (measures)
预防性管理(措施)
9.
School Management Initiative [SMI]
学校管理新措施〔校管措施〕
10.
Discussion about the Legal status and Management of Technological Measures;
略谈技术措施的法律地位和管理措施
11.
Formative Factors and Preventive Measures of Weld Porosity in Butt Welding of Oil & Gas Transmission Pipeline
油气输送管道对接焊缝中气孔的成因及控制措施
12.
Trade Control Measures Database
贸易管制措施数据库
13.
School Management Initiative Constitution
学校管理新措施规章
14.
philosophy [School Management Initiative]
宗旨〔学校管理新措施〕
15.
Traffic Control and Surveillance
交通管制及监察措施。
16.
Trade Control Measures Information System
贸易管制措施信息系统
17.
Causes and Adjustment Measures for Pipe Deviation during Construction
顶管施工中管道偏差成因及纠偏措施
18.
This paper describes the technical measures adopted for soil consol idation and portal soil consolidation in working shaft and receiving shaft of ja cking pipe in order to protect the pipeline.
介绍为保护管线而采取的顶管工作井、接收井的土体加固以及洞口加固等技术措施。