1.
Research on Method of Deciding Total Labour Cost of State-owned Large-sized Enterprise;
国有大中型企业人工成本总量决定方法研究
2.
The labor cost to manufacture a given part or to perform a service depends on the number of work hours (quantity) and the wage rate (price).
对于既定工作,人工成本决定于所耗工时量和工资率。
3.
Sample Quality Determines the Success or Failure of Handwriting Verification;
样本质量决定着笔迹鉴定工作的成败
4.
When a firm decides to install a computer, the cost of the hardware may only be half the total cost.
当一个工厂决定装配一台计算机时,硬件成本只占总成本的一半。
5.
Research on Model of Elastic Controlled Total Wage in Human Cost of State-owned Company
国有企业人工成本弹性控制工资总量模型研究
6.
The number of assemblies used in parallel should be determined by the engineer's judgement based on the operating conditions of a specific installation.
并联安装所采用的总成的数量应该由工程师根据特定安装的运行环境做出决定。
7.
For example, a production worker may be paid a fixed salary (the fixed element) and a bonus based on output (the variable element).
例如,生产工人工资可以包括一块固定工资(固定成本)和按产量计算的奖金(变动成本)。
8.
The Constitution of the Rural Workers Personal Opportunity Cost While They Migrate from Rural to Urban Area and Qualitative Analysis;
农民工城乡迁移个人机会成本的构成及定量分析
9.
What is the total if the cost of labor is taken away from the total?
"若将人工成本自总计中扣除,那总和剩下多少? "
10.
Integrative Decision of Quality-Time-Cost in Engineering Project;
工程项目质量-工期-成本综合评价决策研究
11.
gross domestic fixed capital formation
本地固定资本形成总额
12.
domestic asset formation; domestic capital formation: Gross fixed capital formation plus increase in stocks.
国内资产形成;国内资本形成:指固定资本形成总值加库存的增加量。
13.
How to Determine the Best Cash Amount of Monetary Fund in the Lowest Total Cost Model;
最低总成本模式下最佳货币资金持有量的确定
14.
Analyze the direct labor cost, including measure the work hours, stipulate the standard work hours, maintain and readjust the standard work hours.
生产人力成本分析,包括测量作业工时,制定标准作业工时,并定期维护变更标准工时.
15.
How much output is produced depends on the amount of existing capital.
产量的多少取决于现有资本的总量。
16.
cost-plus approach
工业制造成本(或商业进货成本)加赚头以决定售价的方式
17.
Optimized Construction Supply Chain Cost Decision Model Under Design/Build Delivery Method
施工总承包模式下建筑供应链成本管理优化决策模型研究
18.
Our success in preparing workers and managers to harness those forces will be an important element in the outcome.
成功地使工人和管理人员做好准备,驾驭这些力量,将是决定结果的一个重要因素。