1.
A Model of Capital Stock Adjustment in China in the Transitional Period:A Positive Study;
转型期中国资本存量调整模型的实证研究
2.
The Capital Formation and The Capital Adjustment Model During The China s Transition;
资本形成路径与资本存量调整模型——基于中国转型时期的分析
3.
The global existence of weak solutions to bipolar quantum Drift-diffusion model
双极量子漂移—扩散模型弱解的整体存在性
4.
Coordination Model of Quantity Discount with stock-Level-Dependent Demand in Supply Chain
需求与库存水平相关的供应链量折扣协调模型
5.
Global Existence for a Non-Monotone Fluid in One Dimension in H~2: The Positive Temperature Case;
温度为正值情形一维非单调流体模型在H~2中解的整体存在性
6.
Study on Improved Inventory Coordination Model in A Multi-stage Multi-customer Supply Chain Based on Integer Multiplier;
基于整数乘子的多阶段多顾客供应链库存协调模型的改进研究
7.
Supply Chain Coordination Model with Limited Warehouse and Inventory-Dependent Demand;
货栈容量有限且库存量影响需求的供应链协调模型
8.
Thinking on the theory of capital stock adjustment;
关于资本存量调整理论的思考及启发
9.
The sample provided with this tutorial uses a larger mesh than this, but it is simply a matter of adjusting these two constants.
教程使用比这个例子更大的模型,但仅是调整这两个常量就行了。
10.
The essence of such models is the introduction of lags in the adjustment of variables.
这类模型的实质是在变量的调整中引进时间滞后的概念。
11.
Empirical Analysis on Partial Adjustment to Autoregressive Model of Capital Structure and its Endogenous Variants;
资本结构部分调整自回归模型与其内生性变量的实证分析
12.
The Theoretical Research of the Coming Effect of Adjustment of Agricultural Water Price on the Quantity of Irrigational Water in Tarim River Basin
塔里木河流域未来农业水价调整的需求效应及计量模型研究
13.
MULTI-STAGE PROGRAMMING OF MILITARY EXPENDITURE FLOW AND THE ADJUSTMENT OF ITS STORAGE STRUCTURE;
军费流量多阶段规划与存量结构的调整
14.
Administration division will be readjusted to allow the coexistence of cities upgraded from county seats and towns and appropriately increase the number of cities.
调整行政区划,实行“县改市”与“镇改市”并存的设市模式,适度增加设市数量。
15.
Research on MIS Life Cycle Process Fuzzy Metrics Model;
MIS生存周期过程模糊度量模型研究
16.
Calculating of Adjusting Clearance between Screw Shapes while Machining Rotors of Screw Pump
螺杆型面加工时侧隙余量的调整计算
17.
Main pump flow-rate measurement and adjustment for EX220-5 Excavators
EX220-5型挖掘机主泵流量的检测与调整
18.
Macaulay Duration Gap Management and Flux Ratio Adjustments in a Condition of Interest Rate Change;
利率变动下的存续期缺口管理和流量比例调整