说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 全量程
1.
Research and Design of a New Methane Detector with Full Measuring Range;
新型全量程甲烷检测仪的研究与设计
2.
On safety of edible agricultural products and process control;
食用农产品质量安全问题及全程控制
3.
Improving education quality in general by actualizing quality engineering;
实施质量工程 全面提高教育教学质量
4.
Total Quality Control Is the Key of Doing Well Engineering Quality;
全面质量管理是搞好工程质量的关键
5.
Strengthen Quality Control in the Whole Course of Capital Construction;
强化工程建设全过程的质量监督控制
6.
Construction of the Assurance System for Teaching Quality in an All-round Way throughout the Whole Course;
论全方位、全过程教学质量保障体系的构建
7.
Specification for (GPS) survey of railway engineering
全球定位系统铁路测量规程
8.
The range is usually limited to the full-scale deflection of the indicator.
量程通常以指针的全分度偏转为限。
9.
A Study on Dams Safety Monitoring Engineering Project Quality Management
大坝安全监测工程项目质量管理研究
10.
Integration of Business Process Reengineering and Total Quality Management
企业过程再造与全面质量管理的集成
11.
Push forward the Course Reform Thoroughly and Promote Teaching Quantity Overall;
深入推进课程改革 全面提高教学质量
12.
Administration and Supervision of Quality and Safety of Rural Construction Engineering;
村镇建设工程质量安全的管理与监督
13.
To Consolidate Curriculum Construction and Improve All-round Teaching Quality;
加强课程建设 全面提高教学质量
14.
To Start the Quality Course Construction to Improve the Overall Teaching Quality;
启动精品课程建设 全面提高教学质量
15.
Tightening up the Mangement of the whole Process to improve the Quality of the Graduation Project;
加强全过程管理 提高毕业设计质量
16.
On the Mechanism of Whole-Course Quality Control over Research Projects in Colleges and Universities;
高校科研课题全程质量控制机制探讨
17.
The Historical Process and Its Dominant Force of the Globalization;
全球化发展的历史进程及其主导力量
18.
Application of Total Station in Large Transfixion Survey Project
全站仪在大型贯通测量工程中的应用