说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 定洲电厂
1.
The Application of Optimization Control System PROFI in Guohua-Dingzhou Electric Power Plant;
优化控制系统PROFI在国华定洲电厂中的应用
2.
The Design and Implement of Guohuadingzhou Power Station s Producting Manage System;
国华定洲电厂生产管理系统(BFS++)的设计与实施
3.
Research of Dingzhou Power Plant 600MW Unit 100% Flue Gas Desulphurization Engineering;
定洲发电厂600MW机组100%烟气脱硫工程研究
4.
The Research of the Desulphurization Project Management in Zhuzhou Power Plant;
株洲电厂脱硫工程监理项目管理研究
5.
Methodology Study and Practices of Optimal Maintenance for Gezhouba Hydro Power Plant;
葛洲坝电厂最优维护方法研究与实践
6.
Analysis and Countermeasure of the Faults of the Stability Control Equipment in Gaobazhou Hydropower Plant;
高坝洲电厂安稳装置异动分析与对策
7.
Research on the Cost Control of JiangShu ShaZhou Power Plant Construction
江苏沙洲电厂建设项目成本控制研究
8.
The HRSG Module Erection Work of the Kpone Power Plant,Ghana Africa
非洲加纳博恩电厂余热锅炉模块吊装
9.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
10.
Reform on upper guide bearing supports of generator No.2 of Gaobazhou Hydropower Plant
高坝洲电厂2号机组上导瓦支撑改造
11.
Analysis of Energy Loss and Economic Operation for Main Transformer in Gezhouba Power Plant
葛洲坝电厂主变变损和经济运行分析
12.
Technical regulation for design of the inner communication of fuel power plant
火力发电厂厂内通信设计技术规定
13.
The Research on Fuel Inventory Analysis and Control Strategy of the Power Plant of Zhuzhou;
株洲电厂燃油库存分析与控制策略研究
14.
Study on Multi-industry Development Strategy for Gezhouba Hydroelectric Power Plant;
葛洲坝电厂多种经营产业集团化发展战略
15.
Seepage treatment for expansion joints at drainage ditch of unit 1 at Shazhou power plant
沙洲电厂1号机组排水沟伸缩缝泄漏处理
16.
Improvement on fixing seal strips of hydroturbine guide-vane of Gaobazhou Hydropower Plant
高坝洲电厂水轮机导叶密封安装方法改进
17.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
18.
Implementation of New Efficient Operation Management Mode in the Gezhouba Hydropower Plant
新型高效运行管理模式在葛洲坝电厂的实施