1.
THE NEGATIVE RISK MODEL WITH THE COMPOUND BINOMIAL PROCESS
复合二项过程下的负风险模型(英文)
2.
Structural reliability design of equivalent exponential random variable for exponential distribution-stationary binomial process mode;
指数—平稳二项过程模型结构可靠性当量指数设计
3.
The Gerber-Shui Penalty Function in the Negative Binomial (2) Risk Process;
负二项(2)风险过程的Gerber-Shui罚金函数
4.
A simplified combination method for stationary binomial process of loads
荷载平稳二项随机过程简化组合方法
5.
Application and Study of Process Intensification in 1,4-Butanediol Project;
过程强化技术在1,4-丁二醇项目中的应用研究
6.
Two-line and Three-step Resource Integration Method in the Project Teaching in Higher Vocational Education
高职教育项目教学过程资源集成的“二线三步”法
7.
(12) "agency proceeding" means an agency process as defined by paragraphs (5), (7), and (9) of this section;
(十二)"机关程序"指本条第(五)项、第(七)项和第(九)项所规定的机关活动过程。
8.
Post-evaluation about Construction Implementation Process of Xiangtan Power Plants Second Period Extension Project
湘潭电厂二期扩建工程项目建设实施过程后评价
9.
This is nothing but the binomial expansion.
这不过是二项展开式。
10.
The Quantum Properties in a System Interacting Binomial State Light-field with Several Typical Atoms;
二项式光场与几种典型原子系统相互作用过程的量子特性
11.
Research in Engineering Project Construction Process Management
中交一航局第二工程公司太中银铁路工程项目施工过程管理效能研究
12.
Two-stage-engine Operation
二行程发动机工作过程
13.
recursive procedure for traversing binary tree
遍历二叉树的递归过程
14.
second-order homogeneous nonstationary process
二阶齐次非平稳过程
15.
recursive procedure for generation binary tree
生成二叉树的递归过程
16.
Acts as Technical Principle during project execution.
项目执行过程中担当项目技术负责人。
17.
An Empirical Research on L1 Use in L2 Writing Process of Chinese EFL Writers;
对于中国英语学习者二语写作过程中使用母语现象的一项实证研究
18.
Lectures on modern EPC project management Part 2: Quotation and kick-off of modern EPC project;
现代EPC工程项目管理讲座 第二讲:EPC工程项目报价和项目启动