说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 钢铁企业生产调度
1.
Production Scheduling Optimization at Midium-sized or Small-sized Steel Mill with Short Route
短流程中小型钢铁企业生产调度优化
2.
Coordinated Machine Scheduling and Conveyance Problems of a Steel Works;
钢铁企业生产与运输费用协调调度问题
3.
Research on advanced production planning and real-time scheduling for iron and steel enterprises;
钢铁企业先进生产计划和实时生产调度技术的研究
4.
Realization of Automatic Transport Scheduling Sysem for Molen Iron;
钢铁企业铁水运输调度自动指令系统的实现
5.
The investigation of mental health status f male workers in selected workshops of iron and steel complex
钢铁企业男性职工心理卫生状况调查
6.
Research on Iron and Steel Enterprise Production Cost Management System Based ERP/MES;
钢铁企业ERP/MES生产成本管理系统研究
7.
The Development of Manufacture Management in the International Steel Corporation;
生产管理在国际大型钢铁企业的发展
8.
Study on production planning in iron & steel enterprise CIMS;
钢铁企业CIMS下生产计划的研究
9.
Iron and Steel Enterprise Production Logistics Optimization Based on Petri Nets
基于Petri网的钢铁企业生产物流优化
10.
Study of Reutilization Process of production Waste Water of Iron and Steel Enterprises
钢铁企业生产污水处理回用工艺探究
11.
The Study on Game Relationship between Iron and Steel Production Enterprises and Agent Enterprises
钢铁生产企业和代理企业博弈关系研究
12.
Further streamline leading steel& iron enterprises such as Dazhou Steel and Weiyuan Steel and promote degree of industrial concentration.
进一步整合达钢、钢等骨干钢铁企业,提高产业集中度。
13.
Research on the optimal regulation of low pressure steam system in large-scale iron and steel enterprise;
大型钢铁企业低压蒸汽系统优化调度研究
14.
Research on Aggregate Production Planning Model of Production Line in Iron and Steel Enterprise;
钢铁企业产品线综合生产计划模型研究
15.
On the policy adjustments of both the iron and steel industry and the iron and steel trade enterprise;
论钢铁产业政策与钢材贸易企业经营策略的调整
16.
Intelligent Optimization-based Production Planning and Scheduling in Iron and Steel Industry;
基于智能优化的钢铁生产计划与调度研究
17.
STEEL PRODUCTION DYNAMIC SCHEDULING THEORY AND ITS ENGINEERING APPLICATION:A REVIEW;
钢铁生产动态调度理论研究与工程应用综述
18.
On the Production Planning and Scheduling Optimization for Integrated Steel Production
钢铁一体化生产计划与调度优化问题研究