1.
On the Teaching Reform in PLC Control System Debugging and Fitting
谈《PLC控制系统组装与调试》课程教学改革
2.
Research on the Key Technics during Installation and Commission Process of Large Combined Cycle Units;
大型联合循环发电机组安装调试关键技术与应用研究
3.
Construction,Installation and Commissioning Experiences for 900 MW Units;
900MW机组的施工、安装和调试经验
4.
Assembly and debugging technique of TB880E shield in the narrow space
TB880E掘进机狭小场地组装调试技术
5.
Technology of Quickly Assemble and Debugging in Small Venues of TBM Outside Tunnel
TBM洞外狭小场地快速组装调试技术
6.
Design and Realization of 32-bit Debugger Encapsulated from 16-bit Debugger
16位调试器封装成32位调试器的设计与实现
7.
Check and adjust radial angular and axial misalignment both ends of coupling.
④检查并调整机组的径向、向及周向不对中至机组安装调试标准值。
8.
Check and adjust radial angular and axial misalignment both ends of coupling .
检查并调整机组的径向、角向及周向不对中至机组安装调试标准值。
9.
Study of Project Designing and Teaching Organization in Project-driven Teaching Method
基于项目驱动的《船舶柴油机装配与调试》课程设计与教学组织的研究
10.
Good experience in assembly and adjustment of electromechanical equipments.
有一定的机电一体化设备组装及调试经验。
11.
The Installation and Test of the Hydraulic Turbine Guide Bearing of Three Gorges Right Bank Power Station
三峡右岸机组水导轴承安装及调试特点
12.
Guide for assembly and test technology of runner of kaplan turbine
转浆式转轮组装与试验工艺导则
13.
Introduction of Assembling and Setting Method of Willow Labor ZL50C Car Loader
柳工ZL50C装载机总成装配与调试的方法介绍
14.
Assembly and adjustment of high atmosphere detection laser radar
高空大气探测激光雷达的安装与调试
15.
Debugging and Experiments of Inorganic Synthesis High-Temperature and High-pressure Apparatus;
高温高压无机合成装置的调试与实验
16.
The Assemble and Disassemble,the Debug and the Maintain of the R175A Diesel Engine
R175A柴油机的拆装、调试与维修
17.
Eddy Current Transducer Installation and Debugging in Turbine Axis Displacement and Differential Expansion
汽轮机轴向位移、胀差的安装与调试
18.
Design and Commissioning of the runner transmission unit of the Gaoli Temple
高丽寺转轮藏传动装置的设计与调试