1.
Comparative Analysis of High Wind Processes in Super Typhoon "Krosa" and "Wipha"
超强台风“罗莎”和“韦帕”大风过程对比分析
2.
THE NUMERICAL SIMULATION OF STORM SURGE IN BOHAI SEA CAUSED BY TROPICAL STORM POLLY
渤海“ 9216”特大风暴潮过程的数值模拟
3.
Analysis of Wind Resistant of Long Span Bridges under Construction;
大跨度桥梁在施工过程中的抗风分析
4.
A study on the eyewall expansion of Typhoon Sepat(2009) during its landfall process.
Sepat台风(0709)登陆过程中眼放大现象研究
5.
Diagnostic Analysis For The Strong Gale Case Of Guangdong Cold Wave
广东一次寒潮8级大风物理过程分析
6.
By determining the ventilation resistance of the mine shaft ventilation system, it is found that the ventilation resistance in return airways is particularly large and the ventilation degree is middle.
通过对矿井通风系统进行通风阻力测定,发现矿井回风段通风阻力过大且通风难易程度为中等。
7.
Analysis on an Southeast Gale in Urumqi in April 1998
1998年4月乌鲁木齐东南大风天气过程分析
8.
Imperial Smelting Furnace (ISF) smelting process is a quite complex process.
密闭鼓风炉的熔炼过程极其复杂,工艺结构庞大。
9.
Risk Prevention in M&A of Large State-owned Shipping Industry;
大型国有航运企业并购过程中的风险防范
10.
Research on Risk Management of Our Large-scale Gymnasium and Stadium Running;
我国大型体育场(馆)运营过程中的风险管理研究
11.
Study on Wind Stability of Super Long-Span Cable-Stayed Bridge under Construction
超大跨度斜拉桥施工全过程抗风稳定性研究
12.
Study on Wind Stability of Long-Span Suspension Bridge under Construction
大跨度悬索桥施工过程抗风稳定性研究
13.
Causality Analysis of the Heavy Rainfall by Typhoon Krosa in Zhejiang Province
“罗莎”台风造成浙江特大暴雨的过程分析
14.
ANALYSIS OF A RAINLESS DAMAGING STRONG WIND PROCESS
九江地区一次无降水致灾大风天气过程分析
15.
Cold Air Activities and Topographic Forcing in Severe Torrential Rainfall in Landing Typhoon Depression(Tailim)
“泰利”台风低压大暴雨过程冷空气与地形的作用
16.
Analyses of a Heavy Rain in Pingyang City on October 3,2005
2005年10月平阳一次台风特大暴雨天气过程分析
17.
Large eddy simulation on the process of backdraft of ventilation-limited single-chamber
通风受限单室火灾回燃过程的大涡模拟
18.
Oerall process of estimating the magnitude of risk and deciding whether or not the risk is tolerable.
评价风险大小以及确定风险是否可容许的全过程。