1.
Landuse Variety and Environment Assessing in Second Electric-irrigating Project of Jingtai Plain;
景电二期工程上水前后土地利用变化及生境评价
2.
Design of Neutron Source Assembly for Qinshan Phase II NPP Project
秦山核电二期工程反应堆中子源设计
3.
The Research of Process Control for NPQJVC Phase II Extension Project;
秦山核电二期扩建工程进度控制研究
4.
Study on the Cost Management in the Second Expansion Project of Power Plant of Tieling;
铁岭电厂二期扩建工程费用管理研究
5.
Bidding Algorithm or Power Market and Shengli Power Plant Project Phase Ⅱ;
电力市场竞价模型下的胜利发电厂二期工程
6.
The Study on Pre-evaluation of Construction Project of Bengbu No.2 Power Plant
国电蚌埠发电厂二期扩建工程项目前评价研究
7.
Design and construction of Xian Ren Bei hydroelectric station second-stage closure work
仙人陂水电站二期截流工程设计与施工
8.
Inquire into Supervision on Thermal Works during Capital Works of Beilun Power Plant,Phase II;
北仑电厂二期基建过程热工监督工作的探讨
9.
Control on Schedule and Quality during Engineering Regulation Process for Tuoketuo Power Plant, Phase II;
大唐托克托电厂二期工程调试过程中工期和质量的控制
10.
Prospect and necessity of phase Ⅱ project construction of Luobusha chrome iron mine in Tibet;
西藏罗布莎铬铁矿二期工程建设的前景和必要性
11.
Electronic Engineers
《电子工程师》(期刊)
12.
Design of CRDM for Qinshan Phase II NPP Project
秦山核电二期工程反应堆控制棒驱动机构设计
13.
Design of Reactor Pressure Vessel for Qinshan Phase II NPP Project
秦山核电二期工程反应堆压力容器设计
14.
Qinshan-II Extension Project Severe Accident Countermeasure Analysis;
秦山核电二期扩建工程严重事故对策分析
15.
Research on Equipment Procurement and Supervision for Qinshan Nuclear Power Plant Phase Ⅱ;
秦山核电二期工程设备采购与监造管理研究
16.
Research on the Design Scheme of the 2rd Phase of Coal Terminal Engineering of Wenzhou Power Plant;
温州电厂二期煤码头工程设计方案研究
17.
Discussion on Quality Assurance Classification Management in Guangdong Ling ao Phase II Nuclear Power Project;
广东岭澳二期核电工程质保分级管理的探讨
18.
Design of Pneumatic Quick Isolation Damper in No.2 Project of Qinshan Nuclear Engineering;
秦山核电二期工程气动快速隔离阀的设计