1.
Study on Monitoring and Optimization of Supporting Structure of Deep Foundation Pit for Xisi Subway Station on the 4th Line;
地铁四号线西四站深基坑支护结构监测及优化探讨
2.
Analysis of Ground Distortion for Xisi Subway Station on the Line 4 of Beijing Subway
北京地铁4号线西四站地面变形与分析
3.
Study on Undercrossing Existing Metro Station Construction Scheme of Beijing Metro Line 4 Xuanwumen Station
北京地铁四号线宣武门站下穿既有车站施工方案研究
4.
Comprehensive Construction Techniques for Settlement Control of Xuanwumen Metro Station Crossing Underneath Existing Metro Station on No.4 Line of Beijing Metro
北京地铁四号线宣武门站下穿运营车站沉降控制综合施工技术
5.
Analysis of current collect device of linear motor vehicle on Guangzhou Metro Line4
广州地铁四号线直线电机车辆集电靴系统分析
6.
The Ventilation and Air Conditioning System Design of the YongNingmen station of the Xi,an metro line 2
西安地铁二号线永宁门站通风空调系统设计
7.
Xi'an Metro North Line TOD Model of Site Clearance
西安市地铁二号线北关站点TOD模式探讨
8.
There are four underground lines in Beijing,
北京有四条地铁线,
9.
The transform program of the 0.4KV switches real line monitor in Guangzhou Metro line3 and line4
广州地铁三、四号线环控柜进线开关在线监测改造方案
10.
A Study on the Key Construction Technology about the Double Connecting Tunnel in BaiXue Internal Tunnel of Beijing Metro Line 4;
北京地铁四号线白学区间双渡线段施工关键技术研究
11.
Research on Construct Technique of No.3 Line Interzone Subway in Guangzhou;
广州市地铁三号线体育西路站折返线隧道施工技术
12.
Case Study on Station Territory Development and Design of Tianjin Metro Line 1--Metro Square Design of Area B in Xi nanjiao Station;
天津地铁一号线站域开发设计实例研究——西南角站B地块地铁广场设计实录
13.
Improvement of PIDS on Guangzhou Metro Line 4 vehicles
广州地铁四号线车辆车载乘客信息显示系统改造
14.
Take Metro Line 1 to Shaanxi Nan Lu, Exit 4. Turn right into Maoming Lu, turn left into Nanchang Lu.
座一号线到陕西南路站,从四号出口出去,右拐到茂名路,再左拐进南昌路。
15.
Tai Po Tau No. 4 Raw Water Pumping Statio
大埔头四号原水抽水站
16.
If come by subway, take line2( the second ring road line) to the FuChenMen station, take the southwest exit and walk alone FuWaiDaJie street toward west direction for about3-5 minutes to arrive at the building.
可以乘坐地铁2号线到阜成门站下,西南出口至阜外大街,朝西三五分钟步行即可到达。
17.
However, without theoretical calculation, serious accidents such as the water inrush in Shanghai Subway Line 4 occurred.
然而,由于计算理论的不完善,也出现过诸如“上海地铁四号线透水”的重大工程事故。
18.
Economic Risk Factor Analysis of Urban Rail Transport under PPP-Taking Beijing Metro Line 4 as an- Example;
PPP模式在我国城市轨道交通中的经济风险因素分析——以北京地铁四号线为例