1.
A Research on Flue Gas Desulphurization Project in the Case of 300MW Unit in Shiheng Power Plant;
石横发电厂300MW机组烟气脱硫项目研究
2.
Pre-evaluation on the 2×300MW Thermal and Electricity Project of the Third Phase Shiheng Power Plant;
石横发电厂三期2×300MW热电工程经济性分析
3.
The Development and Application of Performance Management System Project in Shiheng Power Plant;
石横发电厂绩效管理体系项目的开发与应用
4.
The Implementation Effect Evaluation of Three System Reformation Project in Shiheng Power Plant;
石横发电厂三项制度改革项目实施效果评价
5.
#3 Unit Boiler Slagging Influencing Factors and Measures Analysis in Shandong Shiheng Power Plant;
国电山东石横发电厂#3机组锅炉结渣影响因素与措施分析
6.
ShiHeng Power Plant Boiler Leakage Analysis of the Causes and Countermeasure Research;
石横发电厂锅炉泄漏问题的原因分析与对策研究
7.
Research in the Performance Evaluation of Human Resource of Shiheng Power Plant in Shandong;
山东石横电厂人力资源绩效评价研究
8.
Application of the ControlLogix Control System in the Third Issue 2×330MW Units of Shiheng Power Plant;
ControlLogix在石横电厂三期2×330MW机组中的应用
9.
Comprehensive Benefit Analysis and Evaluation of the Project in the ShiHeng Power Plant;
国电石横电厂三期项目(2×300MW)综合效益分析及评价研究
10.
The Pre-Comprehensive Evaluation of Phase Ⅳ 4X1000MW Project Construction Program in ShiHeng Power Plant
石横电厂四期4X1000MW工程建设项目前期综合评价研究
11.
An Introduction to Transformation of the Excitation System for a Dynamo;
矸石电厂2#发电机改换励磁系统简述
12.
a power, chemical plant
发电厂、 化工厂.
13.
Study on the Bidding Decision Support System for the Huanen Shanghai Shidong Second Power Plant;
华能上海石洞口二电厂发电报价辅助决策系统
14.
Improvement of No.2 Generator Excitation System in Mashi Hydropower Plant
麻石水电厂2号发电机组励磁系统改造
15.
Most come from the combustion of fossil fuels in cars, factories and electricity production.
大部分是来自汽车,工厂和发电厂排放的化石燃料。
16.
Gangue Power Plant--An Important Part of Energy Sustainable Development;
煤矸石电厂是能源可持续发展的重要一环
17.
On Dangers Caused by Water Intaking Construction and Its Remediation at Xisai Power Plant
黄石西塞电厂取水施工引发的险情及整险加固
18.
Discussion about solution of gypsum rain when wet desulphurization used for power plant
火力发电厂湿法脱硫“石膏雨”治理方法讨论