说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 岩溶顶板
1.
Fuzzy Reliability Analysis of Stability of Karst Roof under Pile Tip
基桩桩端岩溶顶板稳定性模糊可靠性分析
2.
Determination Method of Safety Thickness of Karst Cave Roofs Under Freeway Subgrade
高速公路路基岩溶顶板安全厚度确定方法
3.
FUZZY POSSIBILISTIC RELIABILITY ANALYSIS METHOD FOR STABILITY OF KARST ROOF UNDER PILE TIP
基桩桩端岩溶顶板稳定性模糊能度可靠性分析方法
4.
Study on the Roof Stability of Concealed Karst Cave under Pile Foundation Loading in Karst Areas;
岩溶区桩基荷载下隐伏溶洞顶板稳定性研究
5.
Analysis of Stability of Cave Roof under Pile Tip in Karst Area
岩溶区桩端下伏溶洞顶板稳定性分析研究
6.
ANALYSIS FOR WATER-INRUSH MECHANISM OF ROOF'S KARST WATER FOR INFLUENCE OF FAULT ACTIVATION
断层活化引发顶板岩溶水突水机理分析
7.
Analysis of cave roof safe thickness in karst region based on catastrophe theory
基于突变理论的岩溶区路基顶板安全厚度分析
8.
Direct roof strong karst aquifer water tunnel boring technology to combat
直接顶板为强岩溶含水层巷道掘进防治水技术
9.
Study on Stability of Soil Cave Roof at Thick-covered Karst Zone in the Yinde Section of Passenger Dedicated Railway from Wuhan to Guangzhou
武广客运专线英德段厚覆盖型岩溶区土洞顶板稳定性研究
10.
Experience in combined supporting for use in large-span underground chamber under soft roof strata
软岩顶板下大断面硐室联合支护经验
11.
Detector of Coal Seam Roof Strata Based on S3C44B0X Framework
基于S3C44B0X构架下的煤层顶板岩层探测器
12.
Control on rock friction sparks and heating-up of sandstone roof in a coal mine
抑制煤矿砂岩顶板岩石摩擦火花和升温
13.
The selecting type of the support and roof control in soft rock coal seam floor
软岩底板煤层支架选型及顶板控制研究
14.
A Model Test Study on Influence of Top Karst Cave on Stability of the Surrounding Rock-mass during Tunnel Construction
隧道顶部溶洞影响围岩稳定性的模型试验研究
15.
Causes of Karstic Collapse in Lead-zinc Mining Area and its Countermeasures
泗顶铅锌矿区岩溶塌陷成因及治理对策分析
16.
Research on Karst Characteristics and Its Hydrologic Property of XiGuoDing Limestone Deposit in Ning-Zhen Mountain;
宁镇山脉矽锅顶石灰岩矿床岩溶发育特征及其控水性研究
17.
Simulation Analysis of Multi-Factors on the Karst Roof Stability under Pile Foundation;
桩基下溶洞顶板稳定性多因素模拟分析
18.
Pressure releasing and gas drainage with long bore hole in roof overburden of fully mechanized caving face
综放面顶板覆岩走向长钻孔卸压抽放瓦斯研究