说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高填方涵洞
1.
Experimental Study on Vertical Load Distribution of High-stacked Culvert
高填方涵洞竖向荷载分布的试验研究
2.
Experimental Study on the Calculation Method of Earth Pressure for High Filling Culverts
高填方涵洞土压力计算方法的试验研究
3.
EPS Engineering Properties for Culvert Load Reduction under High Fill Embankment
EPS材料用于高填方涵洞减荷的工程性质研究
4.
Research on the Earth Pressure Theory and Reinforcement Load Reduction for the Culverts Beneath High Fill;
山区公路高填方涵洞土压力理论及加筋减载研究
5.
The Key Problem of Design in Mass Fill Culvert and Soft Ground Culvert
高填土涵洞和软土地基涵洞设计关键问题探讨
6.
High Fill the Soil Culvert Structure Pattern and the Design Method Researches from Jilin to Caoshi Highway;
吉林至草市高速公路高填土涵洞结构型式及设计方法研究
7.
Study on the Earth Pressure Acting on the Culvert under the Embankment of High-staked Soil and the Load Reducing Technique;
高填路堤涵洞土压力理论及减荷技术研究
8.
Research on the Vertical Earth Pressure Theory Beneath the Layered Buried High-Stacked Embankment;
高路堤分层填筑作用下涵洞拱顶竖向土压力研究
9.
Study on Properties of Stress、Deformation and Reducing-Pressure Mersure on the High-Stacked Culvert;
高填土涵洞土压力与变形及其减荷措施特性研究
10.
A Study on Settlement Rule of Layered Buried High-Stacked Embankment under the Effect of Culvert;
涵洞作用影响下的分层填筑高路堤的自身沉降规律研究
11.
Study on Different Depth Fill on the Cover Slab of the Culverts on Qin-Shen Dedicated Passenger Line;
秦沈客运专线涵洞洞顶不同填土厚度试验研究
12.
Study on Heaving Mechanism and Treatment Measure of Embankment Filling on Culvert of Qinhuangdao-Shenyang Passage-dedicated Railway;
秦沈客运专线涵洞洞顶填土冻胀机理和处理措施研究
13.
The cavity in the tower is filled with high-strength concrete.
在塔内的空洞部分填满高强混凝土。
14.
A Construction Simulation of Backfilled Soil in Layer and Experiment Study of the Earth Pressures on Culverts;
涵洞土压力有限元施工分层填筑模拟与试验研究
15.
The Study on the Engineering Character of Backfill Material and the Backfill Quality Detection at Back of the Bridge and Culvert in Dianlin Expressway
垫邻高速公路桥涵台背回填材料工程特性及回填质量检测研究
16.
tree cavity fillers
树洞填塞物(林业)
17.
On the Stuffing and Construction of Graded Gravel for Transition Zone in the High Speed Rail Bridge;
浅淡高速铁路桥涵过渡段级配碎石的填筑施工
18.
Analysis on construction technology for back filling behind abutment of bridges and culverts in one expressway
某高速公路桥涵台背回填施工技术分析