1.
On the shifting sand tunnel excavation in mined zones and the supporting technique
煤矿采空区流沙隧道开挖与支护技术
2.
Study on Mechanics Behavior of the Excavation and Support-Lining Structure in Caishenliang Tunnel
财神梁隧道开挖与支护衬砌结构力学行为研究
3.
Excavating and supporting construction technologies of Sanyuan Tunnel of Dali Railway in Yunnan
云南大丽铁路三元隧道开挖与支护施工技术
4.
Analysis of rockmass deformation due to expressway tunneling and support in mining areas
矿区高速公路隧道开挖岩体移动与支护技术
5.
Supporting and Protecting Technologies in Bad Location of Soft Crag Tunnel Excavation
软岩隧道开挖不良部位支护实用技术
6.
Research on Mechanism of Pipe Roof Reinforcement and Tunnel Face Stability
隧道管棚预支护体系的力学机理与开挖面稳定性研究
7.
Study of Excavating and Supporting During the Construction of Softrock Highway Tunnel;
软弱围岩公路隧道开挖支护施工过程研究
8.
Research of Bias Tunnel Excavation Sequence and Supporting Structure Optimization
偏压地形隧道开挖顺序及支护结构优化研究
9.
Stability Analysis of Tunnel Face Reinforced with Advanced Pipe Grouting
实施超前注浆管棚支护的隧道开挖面稳定分析
10.
Mechanical Analysis of Support Mechanism of Shed-Pipe Grouting Technology for Tunneling Construction in Shallow-Buried Soft Stratum
浅埋暗挖隧道管棚支护机理力学分析
11.
The Application of Soil Nailing Support in Deep Foundation Excavation of Tianfu Square Tunnel;
土钉墙支护技术在成都市天府隧道深基坑工程开挖中的应用
12.
Numerical Simulation on Stability of Tunnel with Large Cross-section in Process of Pre-reinforcement,Excavation and Support
大断面隧道地层超前预加固及开挖支护过程稳定性的数值模拟
13.
The paper introduces the excavation of a tunnel which is adjacent to an existing electrified railway tunnel, the monitoring, protection and strengthening of the existing tunnel.
介绍一座与既有电气化隧道相邻隧道的开挖、有隧道监测及其防护加固方法。
14.
Research on the Optimized Design of the Excavation-mode and the Supporting-scheme on the Unfavorable Geology Tunnels of the Shiziping Hydroelectric Station;
狮子坪水电站不良地质隧洞开挖方式与支护参数优化研究
15.
Wet sprayed concrete is especially suitable for the support of high bank slope or tunnel excavation.
湿式喷射混凝土特别适用于高边坡支护和隧洞开挖支护。
16.
poling board method (of funnelling)
(开挖隧道时的)插板法
17.
compressed air tunnelling method
压缩空气开挖隧道法
18.
Excavation Construction and Control for Class-V Surrounding Rock in the Shallow Buried Segment of a 3-lane Tunnel
三车道隧道Ⅴ级围岩浅埋段开挖施工与控制