1.
Geomembrane Filming of the Analysis of the Critical Angle in Dam Slope and in Bank Slope;
土工膜防渗结构的铺膜临界角的分析
2.
Research on the Key Part of Paving Geomembrane Machine of Canal Seepage-proofing
塑膜防渗渠道铺膜机械关键部件的研究
3.
The Experimental Study of Watering Device in Film Mulch Seeder with Watering Apparatus;
抗旱坐水铺膜播种机坐水部件的试验研究
4.
The Applying of Laying Vertical Anti-seepage Films Technology in Puman Reservoir s Reinforcement;
垂直铺膜防渗在帕满水库除险加固中的应用
5.
Design and Experimental Study on the Whole Film Mulching and Ridge Forming Combined Machine
起垄全铺膜联合作业机的设计与试验研究
6.
Virtual Design and Experiments of Covering Film and Spraying Parts of Potato Planter Based on Solidworks
基于Solidworks的马铃薯铺膜喷药装置虚拟设计与试验
7.
Research on the Theory of Canal Seepage-proofing by Geomembrane and the Key Technology of Paving Lining by Machine;
渠道塑膜防渗理论与机械化铺膜的关键技术研究
8.
The Computerized Simulation of Working Process of Seed Metering device for 2B QM-2 Plastic Mulch Pneumatic Precision Planter;
2BQM-2气吸式精量铺膜播种机排种装置工作过程的计算机仿真
9.
Cover the dough with a plastic wrap and top with a wet towel.
面团盖上保鲜膜后再铺条湿布巾。
10.
Taxonomic Study of the Ant Genus Tetramorium Mayr from Guangxi(Hymenoptera:Formicidae)
广西铺道蚁属昆虫研究(膜翅目:蚁科)
11.
Influence of 3 fixing fluids on dyeing effect to spreading sections of white rat mesentery;
不同固定液对大白鼠肠系膜铺片染色的影响
12.
Effects of Spreading Solvent on Insoluble Film of 1-hexadecanol at the Air/Water Interface
铺展溶剂对气/水界面上C_(16)OH不溶膜的影响
13.
Systematic Study on the Ant Genera Tetramorium Mayr and Myrmica Latreille (Hymenoptera: Formicidae: Myrmicinae) from China;
中国铺道蚁属红蚁属昆虫系统学研究(膜翅目:蚁科:切叶蚁亚科)
14.
Operative techniques and skills of stretched preparation of retina after angiography in mice
小鼠血管灌注造影视网膜铺片操作技术及技巧探讨
15.
Effect of reflective film on the photosynthetic capacity of leaf and fruit quality at different canopies of peach
铺设反光膜对桃树不同冠层叶片最大光合能力和果实品质的影响
16.
Line a450 gram loaf tin with cling film. Leave some excess cling film hanging over the edge of the tin.
用烤450克长型蛋糕的模子,铺上一层保鲜膜,边缘留多一点保鲜膜垂到模子外。
17.
after the first (ground) tier of columns is erected, ceilihg floor sections are concreted on the ground. Synthetic films are inter-laid between slabs.
第一节(底层)柱子竖起来后,顶棚和楼板在地上浇注。在每层楼板之间铺上合成薄膜。
18.
Laying a stresses absorbing membrane between surface layer and basic layer can prevent reflection crack from developing to a certain extent.
在沥青面层和半刚性基层之间铺设应力吸收膜,具有明显的止裂效果。