说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 引松供水工程
1.
Prediction And Countermeasure Study On Rock Burst In Water Supply Engineering Tunnel For Middle Part Cities Of JILIN Province
中部城市引松供水工程引水隧洞岩爆问题预测
2.
Dicussion on Direction of Principal Geostress in Water Supply Engineering For Middle Part Cities of JILIN Province
中部城市引松供水工程区域主应力方向探讨
3.
Discussion on estimation of tap water price for long-distance water diversion and supply project: Water Diversion Project to North Zhejiang
长距离引水供水工程到户水价的测算探讨——以浙北引水工程为例
4.
Examination and Treatment of Slab Concrete in Songshan Water Introducing Project
松山引水工程面板混凝土表面裂缝检查和处理
5.
The Economic Evaluation and Analysis for the Being-constructed Project of Water Supplying in SongJiangHe Town and Donggang Town, BaiShan City;
白山市松江河镇、东岗镇供水工程项目分析
6.
Design Charactristics of Diversion Pump Station of Water Supply and Envioronment project for Changchun City
长春市供水与环境工程引水部分泵站设计特点
7.
Study on the Optimal Allocation of Water Resources in Tao River Diversion Project Water Suppiy Arca in Gansu Province;
甘肃省引洮工程供水区水资源优化配置研究
8.
Research on Reform of Water Price in Taiyuan Water Supply Area of Wanjiazhai YRDP;
万家寨引黄工程太原供水区水价改革研究
9.
Opinion on Water Price Issue in Water Supply Area of Water Diversion Project from the Yellow River to Shanxi;
引黄入晋工程太原供水区水价问题的思考
10.
Speculation on Water Price Reform of Water-supply Area of the YRDP,Wanjiazhai;
关于万家寨引黄工程供水区水价改革的思考
11.
Numerical simulation of freezing problem of open diversion canal in water supply projects in cold area
寒冷地区供水工程引水明渠结冰问题数值模拟
12.
Research on Water Requirement Forecasting in Water Supply District of Yindaruqin Project
甘肃引大入秦工程供水区需水量预测分析
13.
The Water Quality Real-time Monitoring System of Wanjiazhai YRDP(Yellow River Delivery Project)
万家寨引黄工程供水水质实时监测系统初探
14.
Study on Hydraulic Transients Calculation for Qiling Pump Station of Dongshen Watersupply Project;
东深供水工程旗岭泵站引水工程水力过渡计算研究
15.
An attempt to use 35kV box-type transformer substation for construction power supply of Tao River Water Diversion/Transfer Project Ⅰ
引洮供水一期工程施工供电采用35kV箱式变电站的尝试
16.
The Analysis of the Jinan Attracting Water Engineering Project From the Yellow River for Its Bidding and Submitting;
济南引黄供水工程招标投标分析与研究
17.
The Layout for Water Diversion Works from the Yellow River to Hekou District of Dongying City in Shandong Province;
山东省东营市河口区引黄供水工程规划
18.
Emergency water diversion projects such as the diversion of water from the Yellow River to Tianjin were implemented, and water supply in cities was basically guaranteed.
实施“引黄济津”等应急调水工程,基本保证了城市供水。