1.
Study on the Design Optimization of the Fabricated Structure of the Subway Stationg Constructed by Open-Cut Method and the Mechnaical Behaviour of Construction;
明挖装配式地铁车站结构设计优化及施工过程力学特性研究
2.
Preliminarily Discussion on Introduction of Laying Fabricated Strap Method to Construct Metro Station
浅谈引进装配式铺盖法修建地铁车站
3.
a subway train, station
地铁列车、 地铁站.
4.
Euston is a big Underground station- it serves a main line station bigger than King's Cross.
尤斯顿站是一个大的地铁站——它是一个比国王十字车站大的铁路干线车站的配备地铁站。
5.
Study on Design and Construction Schemes for Metro Station Based on NATM by Using Shield Tunnel;
配合盾构法修建地铁车站的方案研究
6.
rail station platform
火车/地铁/轻铁车站月台
7.
CONSTRUCTION TECHNOLOGY ON SOIL-BODY REINFORCEMENT OF SEPARATED ISLAND PLATFORM METRO STATION
分离岛式地铁车站土体加固施工技术
8.
STUDY ON MODEL TEST OF THREE-BORE METRO STATION CONSTRUCTED WITH THE METHOD OF EXPANDING SECTIONAL SHIELD TUNNELS
配合盾构法建成三连拱地铁车站模型试验研究
9.
Application of Double-Crane Lifting Method to Erection of Bridge Girder in Metro Station
双机抬吊法在地铁车站桥梁吊装施工中的应用
10.
a terminal where subways load and unload passengers.
地铁装卸乘客的终点站。
11.
Study on Tunnel Piston Wind in Shenzhen Metro Xiangmihu Island Station;
深圳地铁香蜜湖岛式车站的隧道活塞风研究
12.
Impacts of metro station type on construction cost of air-conditioning ventilation;
地铁车站形式对空调通风工程造价的影响
13.
Study on Aseismatic Ability of Subway Station on Soft Soil
软土地铁车站结构形式对抗震性能影响的研究
14.
On Choice of Foundation Pit Support Types of Open-cut Metro Station of Xi'an Metro
西安地铁明挖车站基坑工程的支护型式选择
15.
Analysis on Influences of Construction of Island Form Metro Station on Adjacent Bridge Piles
岛式地铁车站施工对邻近桥梁桩基的影响分析
16.
On selection for loading station location of railway in new Shanghai No.1 coal mine
新上海一号煤矿铁路装车站站位选择
17.
Application of Integrated Grounding Connection in the Design of Grounding and Safety of Metro Stations
地铁车站接地与安全设计中综合接地装置的应用
18.
Study on the Mechanics Characters of the Fabricated Linings in the Subway Constructed by Open-Cut Method;
地下铁道明挖区间装配式衬砌力学特性研究