1.
The Research of Reformation and Renewal in Major Passenger Railway Station in China;
我国大型铁路客运站站房改造与更新设计研究
2.
Expediting the renovation of dangerous old houses.
加快危旧住房改造步伐。
3.
We are remodeling these rooms.
我们正在改造这些房子。
4.
Modification of GW5 Disconnector for 110kV Switchyard of Fushi Hydropower Station in the Rongjiang River
融江美亚浮石电站110kV开关站GW5隔离开关改造
5.
Discussion on modification of CSP rolling station yard
薄板厂投产轧钢站车场改造方案探讨
6.
The Research of the Reconstruct Project on Operation Optimization of Water Injection Pumping Station;
油田注水泵站优化运行改造方案研究
7.
Reliability Analysis of Reconstruction and Enforcement on Power Station Boiler Steel Frame;
电站锅炉钢结构改造加固可靠度研究
8.
Research on Strategy and Technology of Large Scale Pumping Station Technique Improvement;
大型泵站更新改造策略及技术的研究
9.
Integrated Automatic System Reconstruction Project of 220kV Substation;
220kV变电站综合自动化系统改造工程
10.
Technical Alteration of the CT-40 Mechanical Hydraulic Governor in the Shitouhe Hydropower Station;
石头河水电站CT-40型调速器技术改造
11.
Views on Improving Construction Safety in Gas Stations Modification;
加油站改造施工中的安全监督与管理
12.
Research on the Alteration of Excitation Regulator in Yangling Hydropower Station;
杨凌水电站励磁调节装置的改造浅析
13.
Issues for attention in renovation of pillar-less rainsheds for large scale passenger stations;
大型客站无柱雨棚改造应注意的问题
14.
The Scheme and Measures for the Renovation of 35kV Transformer Substation;
35kV变电站技术改造方案的实施
15.
Study of Emission Reduce Method of Boiler Rehabilitation or Replacement with CDM
电站锅炉改造(替代)CDM碳减排研究
16.
Analysis of upgrading of the computer monitoring and control system in the 500kV Luoping substation
500kV罗平变电站监控系统升级改造分析
17.
Decision-making for substation retrofits based on LCM and risk assessment
基于LCM及风险评估的变电站改造决策
18.
The study to the comprehensive transformation of the old sewage pumping station in Shaoxing city
绍兴市老排污泵站综合改造实例探讨