1.
A New Technology of Nuclear Emergency Electronic Accountibility System
秦山第三核电厂核应急电子清点系统
2.
Exploration and Practice of Performance Management of Qinshan Phase Ⅲ NPP Operators;
秦山第三核电厂运行人员绩效管理探索与实践
3.
MODIFICATION OF DRAIN MODE IN HIGH-PRESSURE STEAM CONDUCTING PIPE TO STEAM TURBINES OF QINSHAN NUCLEAR POWER PLANT NO.3
秦山第三核电厂汽轮机高压导汽管疏水改进
4.
Feasibility Study on the Constrction of Spent Fuel Interim Dry Storage Facility within TQNPP Site;
秦山第三核电厂厂址建造乏燃料干式中间贮存设施的初步可行性分析
5.
A Study on Developmental Stategy of Third Qinshan Nuclear Power Company Limited
秦山第三核电有限公司发展战略研究
6.
The Study of Secondary Water Chemistry Problem for Qinshan Ⅱ NPP;
秦山第二核电厂二回路水质问题及对策研究
7.
Study on the Anti-Inadvertent-Dilution Modification in Qinshan Phase Ⅱ Nuclear Power Plant;
秦山第二核电厂防硼误稀释事故改造研究
8.
The Optimization of Start-Up Physics Tests of Qinshan Nuclear Power Plant Phase II;
秦山第二核电厂物理启动试验优化探讨
9.
The Advanced Strategic Study of Fuel Management for 4×650MW Units of Qinshan Nuclear Power Plant Phase Ⅱ;
秦山第二核电厂4×650MW核电机组先进燃料管理策略研究
10.
Enlargement Upgrading and Reform of Qinshan Nuclear Power Plant Ⅱ Computer Network Monitoring System
秦山第二核电厂计算机网络监控系统的扩充、升级和改造
11.
The Performance Test of Vanadium Self-Powered Neutron Detector(SPND) Localized for Qinshan third nuclear power plant
秦山第三核电有限公司国产化堆芯钒自给能探测器性能测试
12.
Testing and Operation of Nuclear Air-Cleaning Systems in Qinshan NPP
秦山核电厂核空气净化系统试验与运行
13.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
14.
A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project
秦山三期(重水堆)核电站工程进展概况
15.
Technical improvement in Qinshan Phase Ⅲ nuclear power plant after commercial operation
秦山三期(重水堆)核电站的技术改进
16.
QNPP STEAM GENERATOR TUBE RUPTURE ACCIDENT ANALYSIS
秦山核电厂蒸汽发生器传热管破裂事故分析
17.
The Research about Countermeasures for the Sea Water Pipe Corrosion of Nucear Power Plants in Qinshan;
秦山地区核电厂海水系统管道防腐对策研究
18.
Preliminary Study on Outage Cycle Extension of Qinshan CANDU NPP
秦山CANDU核电厂大修周期延长的初步研究