1.
Construction Technology of Replacing Underlay about the Leikou Bridge’s Maintaining and Reinforcing Project
磊口大桥维修加固工程支座更换施工技术
2.
Reconstruction Plan for Head-span of Existing Overhead Contact System without Rail-car
既有线电气化铁路接触网软横跨无车更换施工法
3.
Hoisting Technique Used in Changing Inner Barrel of a Blare Stack Supported with Tower Mast
塔桅式烟囱内筒体更换吊装施工技术
4.
Construction Method of Replacing the Upper Section of Concrete Poles after Stringing
架线后更换混凝土杆上段的施工方法
5.
Construction Technology of Changing Bridge Rubber Abutment by Integral Jacking
整体顶升更换桥梁橡胶支座的施工方法和措施
6.
Applying New Construction Method in Main Transformer Replacement
新的施工方法在主变更换工程中的应用
7.
Constructing Practice of Changing Top Equipment and Coating Inner Wall of Blast Furnace At The Same Time
高炉炉顶设备更换与炉内喷涂同时施工的实践
8.
Study on the Construction Plan About Replacing the Ombinatorial Switch of Tong-Liao Station for Speed-Lift;
通辽站更换提速组合道岔施工方案的研究
9.
Construction technique of steel-composite girders replaced by large tonnage crawler crane;
大吨位履带吊更换钢混结合梁施工技术
10.
Construction Technology of Replacing Bridge Bearers and Integral Jacking up Beam Slab
桥梁支座更换及梁板整体顶升施工技术
11.
Replacement of Wire Rope Tensioner of Coke Drum and Its Safety Technology
焦炭塔钢丝绳张紧器更换的施工与安全技术
12.
Discussion on the Construction Methods of Replacing Existing Lines' Contact Net Head Span Suspension
更换既有线接触网软横跨施工方法探讨
13.
The organization shall establish and implement a system for production tooling management including tool-change programmes for perishable tools.
组织应建立和实施生产工装管理的系统包括易损工装的更换计划。
14.
Discussion on the Replacement of Steel Tube for Danger-elimination and Innovation of Reverse Iris in Weishui River of Baoji Gorge;
浅谈宝鸡峡韦水倒虹除险改建及更换钢管的施工方法
15.
Construction Technology for Final Tunneling-out Inspection and Cutter Replacement under Complicated Ground Condition
在复杂地层掘进中的盾构出仓检查、更换刀具施工技术
16.
To be Applied by the Be Ultra-thin Hoisting Jack in the Bearing of Bridge Replacement or Whole goes Against Rises in the Construction
超薄千斤顶在桥梁支座更换整体顶升施工中的应用
17.
Application of Grading ring and Grounding Wire Replacement Technology in ±500kV Jiangcheng Transmission Line Rescue Construction
均压环和地线更换技术在±500kV江城抢险施工中的应用
18.
replacement of lift foundation
升降机底座更换工程