1.
Integrated cost/schedule control using the earned value technique.
综合成本/进度控制与挣增值技术。
2.
Study on Quantitative Management for Cost and Schedule Based on USDP;
基于USDP的成本/进度量化管理研究
3.
Improvement of Earned Value Management;
城轨交通工程成本/进度综合控制方法及应用
4.
Implementation of cost/progress control in the software engineering project management;
软件工程项目管理中成本/进度控制的实现
5.
Monitoring control of cost and progress in the stage of construction for the project item
工程项目施工阶段进度与成本的监控
6.
Study on control algorithm of schedule cost based on EVM;
基于EVM的进度成本控制算法研究
7.
Get a supply according to different levels and complete basic sale limit in this district.
按不同的级别进货和完成本区域基本销售额度.
8.
ON APPLYIING EARNED VALUE MANAGEMENT IN COST AND INTEGRATED SCHEDULE CONTROL OF IT PROJECTS;
挣值管理在IT项目成本和进度集成控制中的应用
9.
The Research of Integrated Control to Project Cost and Progress Base on Earned Value Theory;
基于挣值的项目成本与进度的集成控制研究
10.
The intergrated control of project quality,cost and schedule based on the earned value theory;
基于挣值理论的工程质量、成本、进度集成控制
11.
Establishing Earned Value Management System Assembly Managing Project Time and Cost;
建立挣值管理体系 集成控制项目进度与成本
12.
Project progress based on critical chain and cost buffer integration research
基于关键链的项目进度与成本缓冲集成研究
13.
The Applied Study on Progress-Cost Control Model for Highway Construction Projects;
进度—成本联合控制模型在公路施工项目成本控制中的应用研究
14.
Conduct engineering design, insure project meets established schedule, cost, quality.
负责工程设计,控制项目进度,成本以及工程质量。
15.
The Influence of Petrochemical Industry Engineering Project Construction Progress Change to Construction Cost;
石化工程项目施工进度变更对施工成本的影响
16.
The Study and Practice of Progress-Cost Management Approach in Construction Project;
施工项目工程进度—成本管理方法的研究与实践
17.
Analysis on the Evolution Cost Income and Course of State-owned Forestry Property Rights Institution;
国有林产权制度变迁成本收益及进程分析
18.
The Control of Project Quality,Progress and Cost is the Key of Construction Project Management;
工程质量、进度、成本控制是施工项目管理的关键