1.
Design of Crank s Top Dead Centre Data Acquisition System of Electronic Controlled Engine;
电控发动机曲轴上止点数据采集系统设计
2.
"As the piston nears TDC, ignition takes place. The high combustion pressures drive the piston down, and the thrust through the connecting rod turns the crankshaft."
当活塞接近上止点时,发动机点火。燃烧产生的高压驱动活塞向下运动,通过连杆,推动曲轴转动。
3.
The results show that the flow field structures on longitudinal section are similar in a certain crank angle range before TDC.
计算结果表明,在上止点前较大的曲轴转角范围内,纵剖面流场结构相似.
4.
upper center crankshaft bearing
曲轴主轴承上中轴瓦
5.
A pause or breathing at a point of rhythmic division in a melody.
休止在歌曲中节拍分割点上的停顿或呼吸
6.
The distance from the origin to the point at which a line, curve, or surface intersects a coordinate axis.
截距从原点到一条直线、曲线或平面上的点的距离,与坐标轴相交
7.
The technique of copper-lead antithrust axle bush is in the lead in China.
铜铅曲轴止推瓦生产技术国内领先。
8.
crankshaft fan pulley
曲轴上的风扇皮带轮
9.
Pull vibration damper off of the crankshaft.
将减震器从曲轴上拉下。
10.
Remove thrust bearings from rear main bearing carrier.
从后主轴承托架上拆下止推轴承。
11.
The rod-bearing cap attaches the connecting rod to the crankpin.
连杆轴瓦盖将连杆安装到曲轴销上。
12.
Pilot bearing in crankshaft. The pilot bearing in the crankshaft is usually either a Bushing or a Ball bearing.
曲轴上的导向轴承:曲轴上的导向轴承一般或者是轴瓦,或者是球轴承。
13.
before top dead center
在上死点前在上止点前
14.
after top center
上死点后在上止点后
15.
A parameterized spatial surface has been constructed from3 dimensional scattered data, and upon it the5 axis trace for laser processing can be laid out.
将三维离散数据点集拟合为空间参数曲面,在此参数曲面上规划五轴激光加工的等距轨迹。
16.
crankshaft (main journal turning lathe)
曲轴(主轴颈)车床
17.
Remove the crankshaft from the cylinder block (refer to Cylinder Block Disassemble).
从汽缸体上卸去曲轴(参看“汽缸体-拆卸”)。
18.
Remove piston and connecting rods from crankshaft journals.
从曲轴颈上拆下活塞和连杆。