Study on Fault Distance Measurement Methods in 10kV Automatic Blocking and Continous Transmission Lines;
10kV铁路自闭贯通线路故障测距方法研究
2.
Study on Key Points of Traveling Wave Fault Location Applied in Railway Automatic Blocking and Continous Transmission Lines;
行波法在铁路自闭贯通线故障测距中应用的几个关键问题研究
3.
Design of Railway Station Monitoring System on Automatic Blocking Lines(Continuous Transmission Lines)
铁路自闭线(贯通线)站点监控系统的设计
4.
Development of the Location Device for the Fault Section of the Railway 10kV Transmission/automatically Blocked Line;
铁路10kV贯通、自闭线故障区段定位装置的研制
5.
Fault Location on Railway Power Lines Using Travelling Wave Transients;
铁路电力自闭/贯通线路行波故障测距技术
6.
Study on Travelling Wave Fault Location of Railroad Automatic Blocking/Power Continuous Lines;
铁路自闭/贯通线路行波故障测距的应用研究
7.
Research on FTU of 10kV Railway Power Supply Line;
10kV铁路贯通/自闭线的智能控制器FTU的研制
8.
Design and Application of Railway Power Transmission Lines/Automatic Blocking Line Remote Control System
铁路电力贯通/自闭线路远动系统的设计及应用
9.
Adaptability Study of S Injection Method Based Fault Location in 10KV Railway Automatic Blocking and Continous Transmission Lines;
S注入法在铁路自闭/贯通输电线路故障定位中的适应性研究
10.
Research on fault location for single phase earth of 10 kv automatic blocking and continuous transmission lines
铁路10KV自闭/贯通线路单相接地故障定位方案研究
11.
The whole railway line has been joined up.
这条铁路已全线贯通。
12.
Study on distribution automation switch based on resistance distance protection of continuous power transmission line
基于贯通线阻抗距离保护的配电自动化开关研究
13.
wireless automatic block
无线电自动闭塞系统
14.
enclosed self-ventilated type motor
封闭式自通风电动机
15.
After the entire project is completed in 2005, gas will be transported from the Tarim Basin.
2005年全线贯通,开始送塔里木气。
16.
Trajectory Control of Spatial Intersected Curves in Automated Welding;
空间相贯曲线自动焊接中的轨迹控制
17.
Simple-structure and High-performance ATC by Radio Communication System (SPARCS)
基于无线通信的移动闭塞列控系统——SPARCS
18.
Determination of Additional Survey Location of the Gyrostatic Orientation Line in Traverses
贯通导线中加测陀螺定向边位置的确定