1.
Optimization of Construction Schedule and Control Method in Hydroelectric Project;
水电工程施工进度优化及控制方法研究
2.
Optimization and Control of Construction Scheduling in Interbasin Water Diversion Projects;
跨流域调水工程施工进度优化与控制研究
3.
Optimization of progress control for construction of water resources projects based on genetic algorithm;
基于遗传算法的水利工程施工进度优化研究
4.
Study on the Construction Modeling Based on Network Plan
基于Petri网的施工进度建模及优化方法
5.
Study on Project Scheduling and Resource Optimization in Highway Construction Based on Petri Nets;
基于Petri网的公路施工进度计划及资源优化研究
6.
The Installation Schedule and Optimization Method for Mechanical and Electrical Equipment of Hydro Power Station
水电站机电设备安装施工进度计划及优化方法
7.
Application of genetic algorithm in the schedule of the optimization hydraulic project construction;
遗传算法在水利工程施工进度控制优化中的应用
8.
Optimization of Water Engineer Construction Programmer Based on Multi-objective Genetic Algorithm
基于多目标遗传算法的水利工程施工进度计划优化
9.
RISK ANALYSIS OF CONSTRUCTION SCHEDULE WITH OPTIMUM CASH FLOW;
最优资金流施工进度计划的风险分析
10.
The Influence of Petrochemical Industry Engineering Project Construction Progress Change to Construction Cost;
石化工程项目施工进度变更对施工成本的影响
11.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
12.
Optimization of Engineering Project Payment Scheduling: A Case Study;
工程项目支付进度优化:一个案例研究
13.
Intelligent optimization for the first coal face project scheduling in coal mining
煤矿首采面开工进度计划的智能优化
14.
Compilation and Optimization of a Construction Project Cost Plan with Interval Numbers;
利用区间数进行施工项目成本计划编制及优化
15.
Application of Network Chart Optimization in Excavation Construction of Rock Draft
网络图优化在岩巷掘进施工组织中的应用
16.
Study on Optimization Analysis of Cable Force for Construction Control of Long-span Multi-arch Bridge
大跨度多肋拱桥施工控制索力优化分析研究
17.
Simulation and Optimization for Long-span Changing Curvature Vertical Curve Steel-box Girder Bridge Constructed by Incremental Launching Method
大跨度变曲率竖曲线钢箱梁顶推施工仿真优化
18.
The Optimized research that After the bracket construction long span beam bridge operation continues the amount of deflection
悬臂施工大跨梁桥运营后持续挠度优化研究