1.
The research on the application of the pipe jacking in the repairs of the water supply pipes
非开挖顶管工艺在供水管道修复中的应用研究
2.
Calculation and Analysis of the Key Construction Parameter by Useing EPB Pipe Jacking Method
土压平衡顶管施工工艺参数的计算分析
3.
Study on the Jacking Force Induced by Linear and Curved Pipe Jacking Construction;
直线及曲线顶管施工中的顶推力研究
4.
Construction technology for adjustment of 1750 t concrete box pier top deviation
1750t混凝土箱梁墩顶偏差调整施工工艺
5.
Waterproofing technology for landscape pond on underground garage
地下车库顶部景观水池防水施工工艺
6.
Analysis on Problems of Top Coal Loading Technique Replaced by Tamping Coking Technique
顶装煤工艺改为捣固炼焦工艺后的问题分析
7.
Hydraulical Model on Slag Splashing for BOF
顶吹转炉溅渣工艺水力学模型的研究
8.
STUDY ON SHAPING TECHNOLOGY OF HOT TOP EMC OF ALUMINUM THIN STRIP
铝薄板热顶-电磁铸造成型工艺研究
9.
Research on Integrated Process of Fixed Roof Tanks with Vapor Recovery System
固定顶油罐与油气回收集成工艺研究
10.
Study on Gateway Top Caving Technology for Steep-inclined Coal Seam
急倾斜煤层巷道放顶煤回采工艺研究
11.
120 tons of converter are equivalent to the bottom compound blowing technology in applying
120t转炉顶底复合吹炼工艺技术应用
12.
Welding procedure and quality control for roofs of type HX_D1 locomotive
HX_D1型机车顶盖焊接工艺及质量控制
13.
In order to producte qualified inlet manifold casting, top gating system with lip riser and shell core made of precoated sand is used.
为了获得合格的进气歧管铸件,采用压边顶铸浇注系统和覆膜砂壳芯制作工艺。
14.
The construction quality control of long distance and large bore steel pipe driving
长距离大口径钢管顶管施工质量控制
15.
Causes and Adjustment Measures for Pipe Deviation during Construction
顶管施工中管道偏差成因及纠偏措施
16.
Technology and Control of First Roof Caving at Fully Mechanized Coal Face with Hard and Massive Overlying Strata
厚层坚硬顶板综采工作面初次放顶技术管理
17.
Jack-up,Pan Reset Scheme and Construction Craft of Bridge Beams
桥梁梁体顶升、平移复位维修方案及施工工艺
18.
Construction of planted deck over parking area of Haitai Innovation base, Tianjin
天津海泰创新基地车库种植顶板施工工艺