说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 内河码头
1.
The Research o n Shear Strength of Reinforced Concrete Composite Structure in Freshwater Whart;
内河码头中叠合结构斜截面抗剪性能研究
2.
"River Trade Terminal (Area 38, Tuen Mun)"
屯门38区内河货运码头
3.
river trade multi-purpose terminal
内河船只使用的多用途码头
4.
Architectural Characteristic Study of Large Water-level Bridge Crane Wharf in Inland River
内河大水位差桥吊码头结构特性研究
5.
Analysis of reasonable gradient in ramp overhead of Ro-Ro wharves in inland rivers
内河汽车下河码头架空斜坡道合理坡度研究
6.
The first phase of the River Trade Terminal commenced operation in October 1998.
内河货运码头第一期,已于一九九八年十月启用。
7.
Modeling and Analysis of Modern Freshwater Power Coal Terminal Logistics System;
现代内河电煤码头物流系统建模与分析
8.
Constructing Container Terminals in Hefei and Developing Inland Intermodal Transport;
建设合肥集装箱码头 发展内河多式联运
9.
Research on Simulation of 3D Visualization on Inland River Container Port
内河集装箱码头三维可视化仿真技术研究
10.
This location means that many river trade vessels will be able to avoid the busy Ma Wan Channel.
码头位于屯门,许多内河船只将可避免使用繁忙的马湾海峡。
11.
Study on the Interaction between Inland River Suspended Vertical Frame Wharf and High-Cut Bank Slope
内河架空直立式框架码头与高陡岸坡共同作用研究
12.
Study on the Impact of Overhead-erection Ramp Wharf after the Impounding Water of the Three Gorges Reservoir
三峡蓄水对内河大水位差架空斜坡道码头的影响研究
13.
3D simulation analysis of construction process on frame wharf with a great range of stage in inland rivers
内河大水位差框架码头结构施工过程三维仿真分析
14.
Phase I of the Tuen Mun River Trade Terminal commenced operation in October 1998 to enhance cargo services on the river trade.
屯门内河货运码头第一期在一九九八年十月投入服务,以改善内河货运的服务。
15.
In the next two years, China will improve 2400 kilometers of inland river routes and build more than 160 new berthing points, including container docks.
今后两年,中国将改善内河航道二千四百公里,兴建包括集装箱码头在内的新泊位一百六十多个。
16.
The river of time has no docks along its course.
时间长河中原是没有什么码头的。
17.
A jetty projected into the river.
一处小码头直插进河水中。
18.
The project is on target and phase one is due to start operating in the latter half of 1998.
内河货运码头的工程进展顺利,第一期设施将于一九九八年下半年落成启用。