1.
Locking calculation on the closing section of continuous rigid-frame beam
刚构连续梁合拢段施工方案与锁定计算
2.
The Construction Technique of Prestress Concrete Continuous Box Beam Close-up Section
悬臂浇筑预应力混凝土连续箱梁合拢段的施工技术
3.
Calculation Analysis of Closure Jacking Force and Introduction to Construction Monitoring Scheme of Incremental Launching of Continuous Rigid Frame Bridge
连续刚构桥顶推合拢的计算分析及施工监控
4.
Optimization Study on Construction Control and Closure Sequences of the Long-span and Long Connected Continuous Girder Bridge
大跨长联连续梁桥施工控制及合拢顺序优化研究
5.
Long multi-span prestressed concrete rigid frame-close up of continuous beam bridge construction
长联多跨预应力混凝土刚构—连续梁桥的合拢施工
6.
Research on the Kinetic Model of Automatic Attitude Adjustment for Ship Block
船体总段自动合拢小车控制模型研究
7.
Mechanical Structure Model Research on Hull Assembly Devices
船体分段合拢设备机械结构模型研究
8.
The construction technology of Pengxi river cable stayed bridge side span cast-in-place section and closure section
彭溪河斜拉桥边跨现浇段及合龙段施工工艺
9.
The Contract of Building Construction Systems Management;
工程建设(施工阶段)合同系统管理
10.
Uncertain factors in construction of continuous girder bridge such as side span joint scheme and different balanced cantilever construction speed are analyzed.
对施工中的不确定因素,诸如边跨合拢方案和不同桥墩悬浇进度不一致等进行了分析比较。
11.
GENETIC ANALYSIS OF LONGITUDINAL CRACKS IN CLOSURE SEGMENT OF AN EXTRALARGE BRIDGE IN DONGPU
东圃某特大桥合拢段纵向裂缝成因分析
12.
Construction Technology for Steel-concrete Composite Segment of Self-anchored Suspension Bridge
自锚式悬索桥钢-混结合段施工技术
13.
On technical keys in the construction of the closing part of continuous steel bridge
浅谈连续刚构桥合龙段施工技术要点
14.
Methodology for Cost and Schedule Control of Electric Power Construction Project;
电力工程项目施工阶段进度费用联合控制研究
15.
Alterations of Engineering Works in Implementation of Contract of Dahuofang Reservoir Water Diversion Project;
大伙房水库输水工程合同实施阶段的工程变更
16.
Study on Structural Behavior of Steel-concrete Composite Beam Bridge in Constructing Phase;
钢—混凝土结合梁桥施工阶段受力性能研究
17.
The Finite Element Analysis of CFST Arch Bridge with Combinated System during Construction Procedure;
钢管混凝土组合拱桥施工阶段有限元分析
18.
Reasonable Cable Tension in Finished State of Cable-Stayed Bridges and the Control during Construction;
斜拉桥的合理成桥索力和施工阶段索力控制