1.
Construction Techniques for a (60+128+60) m Tied Arch and Continuous Girder Bridge
铁路(60+128+60)m系杆拱连续梁施工技术
2.
The Structure Design, Construction Technology of Continuous Rigid-Frame Beam Bridges
连续—刚构连续体系梁桥结构设计及施工工艺
3.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
4.
Research of Construction Control for Prestressed Concrete Continuous Beam Bridge;
预应力混凝土连续梁桥施工控制研究
5.
Study on Construction Control of Cantilever Erection Continuous Curved Girder Bridge;
悬臂拼装曲线连续梁桥施工控制研究
6.
Construction Monitor of Large Span Continuous Box Girder;
大跨度连续箱梁桥施工监控技术研究
7.
Construction Controlling and Simulation of Continuous Bridge with ANSYS;
连续梁桥施工控制与ANSYS仿真分析
8.
Construction Monitor of Taolaizhao Songhuajiang rigid-Continuous Bridge;
陶赖昭松花江刚构—连续梁桥施工控制
9.
Construction Technique of Continuously Changing Hight Prestressed Concrete Beam 0 #;
变截面预应力砼连续梁0#块的施工
10.
Construction Control of PC Continuous Beam Bridge and Analysis of Closure Parameter
PC连续梁桥施工控制与合龙参数分析
11.
On Multipoints Jacking Construction of Zhujiang Bridge with 5 × 50 m Continuous Box Girder
珠江大桥5×50m连续箱梁多点顶推施工
12.
On construction control of continuous prestressed concrete bridge
浅议预应力混凝土连续梁桥施工控制
13.
Cantilever constructional requirements and controlling methods of continuing bridge
连续梁桥的悬臂施工要求和控制方法
14.
Construction Techniques for Segment No.0 of the Continuous Girder of the Wujiawan Mega Bridge
吴家湾特大桥连续梁0~#块施工技术
15.
Key Construction Techniques on Fly-over Continuous Box Girder on Passenger Dedicated Line
客运专线跨线连续箱梁施工关键技术
16.
Construction of the prestressed concrete continuous box beam cantilever casting
预应力混凝土连续箱梁悬臂灌注施工
17.
Construction of fish-bellied large volume continuous box girder groove
大体积鱼腹式槽型连续箱梁施工技术
18.
Discussion on the construction control of large span continuous steel bridge
浅谈大跨度连续刚构桥梁的施工控制