说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 进水口高边坡
1.
Research on the Stability of High Slope of the Intake of Xiangjiaba Hydropower Station;
向家坝水电工程进水口高边坡稳定性研究
2.
Stability Study and Strengthen about High Slope of Enter Water Mouth of Diversion Tunnel of Secondly Hydroelectric Power Station of Jinping;
锦屏二级水电站引水隧洞进水口高边坡稳定性研究及加固处理
3.
Study on Stability of Intake High Slope on Pilot Generating System of Jinchuan Hydro-power Station in Dadu River
大渡河金川水电站左岸引水发电系统进水口高边坡稳定性研究
4.
Analysis of high slope stability of the entry of water tunnel of DAPEIN(I) Hydropower Station in Burma
缅甸DAPEIN(I)水电站引水发电隧洞进水口高边坡稳定分析
5.
DEFORMATION-FRACTURE MECHANISM ANALYSIS AND STABILITY EVALUATION OF HIGH SLOPE FOR WATER-INTAKE OF XIAOWAN HYDROPOWER STATION
小湾水电站进水口高边坡变形机理分析及工程意义
6.
Analysis on Construction Difficulties of High Slope Excavation at Intake of Underground Powerhouse at Xiangjiaba Hydropower Station
向家坝电站地下厂房进水口高边坡开挖施工难点剖析
7.
The stability of high side slope in underground powerhouse intake is an important techniqchal problem that should be resolved during construction of Longtan hydropower station.
地下厂房进水口高边坡稳定是龙滩水电站建设必须解决的重大工程技术问题。
8.
Checking Evaluation to the Stability and Validation Analysis to the Optimization Design on Supporting of the Intake High Slope for Xiaowan Hydroelectric Power Station in Lancang River;
澜沧江小湾水电站进水口高边坡稳定性复核及支护优化设计方案验证
9.
ANALYSIS ON BLASTING VIBRATION EFFECT ON PRSTRESSED CABLE OF HIGH SLOPE IN ZIPINGPU PROJECT
紫坪铺进水口高陡边坡锚索抗爆破振动分析
10.
High Slope Anchorage at Diversion Tunnel Inlet of Shenxigou Hydropower Station
深溪沟水电站导流洞进口高边坡锚固技术研究
11.
Stability Estimation and Support Scheme Study to the Water Inlet Slope of Lianghekou Hydroelectric Power Station
两河口水电站引水进口高边坡稳定性评价及支护方案研究
12.
Excavation and support techniques for high slope at entrance of diversion tunnel of Pankou Hydropower Station
潘口水电站导流洞进口高边坡开挖与支护施工技术
13.
Recheck stability of left bank slope at water intake of Baise HPP
百色水电站进水口左侧边坡稳定复核
14.
Study of Stability Analysis and Treatment of High Slope in Water Entrance of Hydropower Plant in Wawushan;
瓦屋山引水洞进口高边坡稳定性分析及治理措施研究
15.
Stability analysis on high slope at inlet of No.1 diversion tunnel for initial stage of construction of Changheba Hydropower Station
长河坝水电站1~#初期导流洞进口高边坡稳定分析
16.
FEM CALCULATION OF HIGH INLET SLOPE OF DIVERSION TUNNEL ON RIGHT BANK OF CHANGHEBA HYDROPOWER STATION
长河坝水电站右岸导流隧洞进口高边坡稳定性有限元计算分析
17.
The Stability Analysis of the In-Outflow Slope of Shuangjiangkou Hydroelectric Power Station;
双江口水电站进出水口边坡稳定性分析
18.
Water Guiding Tunnel Slope Stability Analysis in Right Bank in JinChuan Hydro-power Station;
金川水电站右岸导流洞进水口边坡稳定性评价