说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 深水高坝
1.
The Research of Static & Dynamic Stress and Deformation for Deepwater and High Dam in Chunhua Reservoir;
纯化水库深水高坝静动力应力变形研究
2.
The water deepened after the dam was built.
堤坝建成後水已加深.
3.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
4.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
5.
The river was so high that the dam gave way.
河水如此高,堤坝冲垮了。
6.
Preliminary Studies on the Depth Selection of Seepage Calculation on the Infinite Deep Pervious Foundation
大坝无限深透水地基渗流计算深度选取初探
7.
Water power schemes (hydroelectric schemes) are of two types, high dams and low dams
水力发电工程(水电工程)有高坝和低坝两种类型。
8.
Mathematic Model for Bedrock Scoured Balance Depth of River Bed under the Action of Left-Right Collision of Water Jet from High Arch Dam
高拱坝挑流水舌左右碰撞作用下河床基岩冲刷平衡深度的数学模型
9.
Experimental study on geotube embankment stability with deep currents
管袋堤坝在深水水流作用下的稳定性试验
10.
Seepage Control Calculation Model and Relevant Problem of Earth-rock Dam on Infinite Deep Pervious Foundation;
无限深透水地基上土石坝坝基渗流控制计算模型及有关问题研究
11.
The Seepage Calculation Methods Study of the Vertical Seepage Control Wall on the Earth-rock Dam, Which Based on the Infinite Deep Pervious Foundation;
无限深透水地基上的土石坝坝基垂直防渗体的渗流计算研究
12.
Study on the Engineering Geological Property of Deep Overburden in the Qizong Hydroelectric Power Station, Jinsha River
金沙江其宗水电站下坝址坝基深厚覆盖层工程地质研究
13.
Analyze main dam foundation deep slide stability with Monte Carlo method for Baise Multipurpose Dam Project
采用蒙特卡洛法研究百色水利枢纽主坝坝基深层抗滑稳定
14.
Design of High Arch Dam Based on Red Bed
红层地区高拱坝——香溪口水库大坝的设计
15.
High Gravity Dam Baozhusi Hydropower Station Research on Combined Functions of Power Plant with Dam;
宝珠寺水电站高重力坝厂坝联合作用研究
16.
A Study on the Suitability of Building the High Rockfill Dam in the Underside Dam Site of the Changheba Hydroelectric Station in Daduhe River;
大渡河长河坝水电站下坝址建高(堆石)坝适宜性研究
17.
FEASIBILITY STUDY ON CONSTRUCTION OF HIGH DAM AT MIDDLE REACHES OF JINSHA RIVER WITH THICK RIVERBED DEPOSIT
金沙江中游上江坝址河床深厚覆盖层建高坝可行性探讨
18.
Study on the Amount of Saving Water under the Water-saving Irrigation Project in Bashang Plateau;
坝上高原区节水灌溉措施节水量研究