说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 拱坝工程
1.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
2.
Analysis on Engineering Geological Conditions of the Arch Dam in Lijiahe Reservoir of Xi'an City
西安市李家河水库拱坝工程地质条件分析研究
3.
Gravity arch dam abutment rock stability and its engineering treatment measurements
重力拱坝坝肩岩体稳定与工程处理对策
4.
Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;
施工过程及底缝对高拱坝的影响研究
5.
Research and Treatment on Main Engineering Geologic Problems of Zhaolaihe River Arch Dam
招徕河拱坝主要工程地质问题及处理
6.
Crack treatment on concrete arch dam of Xiakou Hydropower Station
峡口水电站工程混凝土拱坝裂缝处理
7.
Study on Engineering Work Budget Method in Computer Simulation of Arch Dam Construction
计算机模拟拱坝施工中工程量预算方法研究
8.
The Geological Evaluation of the Rock Mass Engineering after the Excavation of the Spandrel Trough between the Banks of Xi Luo Du Hydropower Station;
溪洛渡水电站高拱坝两岸拱肩槽开挖后岩体工程地质评价
9.
Study on Construction Process Simulation and Optimization for High Roller Compact Concrete Arch Dam;
高碾压混凝土拱坝施工过程仿真与优化研究
10.
Application of the Program by the CASIO-4800 Calculator into the Construction Measuring for the Double Curve Arch Dam
CASIO-4800计算器编程在双曲拱坝施工测量中的应用
11.
Engineering Geology Research on Bounderary Condition of Dam Abutment Resisting Force Body of Dagangshan Hydroelectric Power Station on Dadu River
大渡河大岗山水电站拱坝坝肩抗力体边界条件工程地质研究
12.
Study on Systematical Engineering Geology of Controlling Rock Mass Structure in Dagangshan Arch Dam Foundation;
大岗山拱坝坝基(肩)控制性岩体结构的系统工程地质研究
13.
Researches in the Influence of Foundation Excavation on Engineering Properties of Foundation Rock in High Arch Dam;
高拱坝坝基开挖对建基岩体工程特性影响的研究
14.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例
15.
DEFORMATION EQUATIONS OF CIRCULAR ARCHES AND THEIR APPLICATION TO ARCH DAM ANALYSES
圆拱形变方程及其对拱坝分析的应用
16.
Study on thrust angles of high arch dam abutment during overloading
超载过程中高拱坝坝肩推力角的研究
17.
A Study on Hydraulic Model Test of Pulu Hydropower Project in Lipu County
荔浦县蒲芦水电站工程拱坝水工整体模型试验研究
18.
Engineering Geological Feasibility Study of High Arch Dam Construction at Baihetan Hydropower Station, Jinsha River;
金沙江白鹤滩水电站高拱坝建设工程地质适宜性研究