1.
Research on Development Strategy of Changsha Electrical Machinery Co., Ltd;
长沙电机厂有限责任公司发展战略研究
2.
The Research of the Incentive Mechanism on the Managements of the Changsha Electrical Machinery Co. Ltd.;
长沙电机厂有限责任公司管理人员激励机制研究
3.
EQUIPMENTS MANAGEMENT AND REPAIR OF 660MW UNITS IN SHAJIAO C POWER PLANT;
沙角C电厂660MW机组设备管理与检修
4.
A PEPTIC ULCER SURVEY AMONG 1451 STAFF MEMBERS AND WORKERS IN CHANGSHA TRACTOR FITTING PLANT
长沙拖拉机配件厂1451名职工溃疡病普查报告
5.
The Research on Employee Performance Appraisal System of Machinery Enterprise of the Changsha Research Institute of Mine;
长沙矿山研究院机械厂员工绩效考评体系研究
6.
Study of Sand-mud Abrasion, Cavitation Damage and Their Protections for the Turbines of the Sanmenxia Hydropower Station
三门峡水电厂水轮机泥沙磨蚀及其防护的研究
7.
Seepage treatment for expansion joints at drainage ditch of unit 1 at Shazhou power plant
沙洲电厂1号机组排水沟伸缩缝泄漏处理
8.
Impact of Circulating Water Temperature Rise on Units at Shajiao C Power Station
循环水温上升对沙角C电厂机组的影响
9.
Research and Development on Software of Fault Recorder Apparatus of Generator in JingSha Power Plant;
金沙发电厂机组故障录波装置的软件开发及研究
10.
TEST STUDY ON START-UP AND SHUTDOWN OF COAL PULVERIZER WITHOUT INJECTIN FUEL OIL IN NORMAL OPERATION OF BOILERS IN SHAJIAO B POWER PLANT
沙角B电厂锅炉运行不投油起停磨煤机试验研究
11.
AUTOMATION TECHNIQUE RENOVATION OF UNIT No.1 & 2 IN CHANGCHUN No.2 THERMAL POWER PLANT
长春热电二厂1、2号机组自动化技术改造
12.
Analysis for Shutdown of 100 MW and Below Generating Units in Datang Changshan Thermal Power Plant;
大唐长山热电厂100MW及以下机组关停分析
13.
Research on the Reform About the Teaching Practice in Changsha University;
长沙大学机电专业实习教学改革研究与探讨
14.
Coordination of Grounding Protections for 6.3kV Auxiliary Power System in Shajiao B Power Station
沙角B电厂6.3kV厂用电系统接地保护的配合
15.
The Enterprise Culture Restructure of Changsha Cigarette Factory Chenzhou Branch;
长沙卷烟厂郴州卷烟分厂企业文化重构
16.
The Research on the Reform of Changsha Petroleum Factory;
长沙石油厂改制中的问题及对策研究
17.
One Dimensional Model of Reservoir Sedimentation and Its Application in Calculation for Water Intake of a Power Plant
白沙水库—维泥沙数学模型及电厂取水方案计算
18.
Research and Application of Stator Bar with Elongation of 360°Transposition in Xinanjiang Hydropower station Hydrogenerators
新安江水力发电厂发电机定子线棒延长360°换位方式的研制和应用