On methods of the manual measurement of the shield machine posture in the subway shield station
地铁盾构施工中人工测量盾构机姿态的方法
2.
Describe Shield Segment Erection Quality Control Measures on the Metro
浅谈地铁盾构管片拼装质量控制措施
3.
Analysis of influence of metro shield tunneling crossing underneath high speed railway
地铁盾构隧道下穿京津城际高速铁路影响分析
4.
Study on Ground Settlement Monitoring Due to Shield Construction in Metro Tunnel;
地铁盾构隧道施工期地表沉降监测研究
5.
Numerical Simulation Analysis on Ground Surface Settlement Induced by Subway Shield Construction
地铁盾构施工引起地表沉降的数值模拟研究
6.
The dynamic response of the subway shield tunnel under oblique seismic waves
地震波斜入射时地铁盾构隧道的动力反应分析
7.
Construction Technology on Metro Shield Tunnel through Gas Stratum
地铁盾构隧道穿越瓦斯地层的施工技术
8.
Physical modeling test on shield tunnel crossing ground fissure with 30°
地铁盾构隧道30°斜穿地裂缝的物理模拟试验
9.
Research on the Construction Schemes of Metro Station Driven with Enlarging Shield Tunnels;
盾构扩挖修建地铁车站施工方案研究
10.
Feasibility Analysis of Shield Driving Method Used in Interzone Tunnel in Chengdu Metro;
成都地铁区间隧道盾构法可行性分析
11.
Study on Design and Construction Schemes for Metro Station Based on NATM by Using Shield Tunnel;
配合盾构法修建地铁车站的方案研究
12.
Key technologies of earth pressure balance shield in Chengdu metro construction
成都地铁土压平衡盾构施工关键技术
13.
The shield machine turnaround technology in Tianfu square of Chengdu subway
成都地铁天府广场站盾构机调头技术
14.
The Tunneling Technology of Minor Radius Curve Metro Tunnel Shield Method
小半径曲线地铁隧道盾构法掘进技术
15.
On analysis of shield construction through existing subway in running tunnel
盾构施工下穿既有地铁区间隧道分析
16.
Type selection and key configuration of shield machine for the subway experimental section
郑州地铁试验段盾构选型及关键配置
17.
On Shield Method Construction Techniques of Shenzhen Metro Crossing-railway Interval Tunnel
深圳地铁穿越铁路的区间隧道盾构法施工技术
18.
Research on Ground Surface Subsidence Laws of Compound Stratum during Underground Tunnel Construction by Shield Method
复合地层中盾构法建设地铁地表沉降规律研究