1.
Solving multi-mode project rescheduling problem with PSO algorithm
粒子群优化算法求解多模式项目再调度问题
2.
extraordinary items and prior year adjustments
非常项目和上年度调整数
3.
An Algorithm for Solving the Resource Constrained Project Scheduling Problem;
资源受限的项目调度问题的求解算法
4.
Analysis of Coordinating Control of Pace-Quality in Construction Project Management;
工程项目进度与质量的协调控制分析
5.
The Research of Real Time Project Based on the Linux Environment;
基于Linux环境的实时调度项目的研究
6.
Study of the Multi-project Scheduling Problem of Flexible Resource Constraint;
柔性资源受限的多项目调度问题研究
7.
A Multi-Pass Biased Random Sampling Method for Scheduling Multiple Projects;
随机抽样算法在多项目调度中的应用
8.
Critical chain -- A new method for project planning and scheduling;
关键链——一种项目计划与调度新方法
9.
Max-npv project scheduling problems with cash flow balance constraints
现金流平衡约束下的Max-npv项目调度
10.
Hybrid genetic algorithm for resource constrained multi-project scheduling problem
资源受限多项目调度的混合遗传算法
11.
Decomposition and optimization methods for large-scale project schedules
大规模项目调度问题的分解和协调优化方法
12.
Study on Bank Credit Limit Based Max-NPV Project Scheduling Problems
基于银行授信额度的Max-NPV项目调度问题研究
13.
Research on Project Supply Logistics Scheduling of Manufacturing System with Large Logistics Engineering Project;
大物流工程项目类制造系统项目供应物流调度研究
14.
Credibility and Effectiveness Examination on Sampling Investigation on Gaduates in the Experimental Unit of Open Edcation of Hunan Radio and Television University;
湖南电大试点项目毕业生追踪调查抽样调查信度和效度检验
15.
A New Heuristic Project Scheduling Method for Emergency Response
一种适用于紧急事件调度的启发式项目调度新方法
16.
The distributor could not schedule a worker thread to process a work item.
分发服务器无法调度工作线程来处理工作项目。
17.
A distributor worker thread could not schedule the next work item.
分发服务器工作线程无法调度下一个工作项目。
18.
Coordinate programs including planning, scheduling, ordering, and tracking.
项目协调,包括制定计划,进度安排,分类及跟踪。