1.
Research of Boiler Air Flow Measurement in Power Plant
火力发电厂锅炉送风流量测量方法研究
2.
Improved Design of Primary Chamber Inlet Port of Circulating Fluidized Bed Boiler
循环流化床锅炉一次风室送风口的改进设计
3.
boiler capacity
锅炉容量,锅炉蒸发量
4.
Investigation of Aerodynamic Field in 600MW Unite Boiler Model by Particle Image Velocimetry Measurement;
600MW机组锅炉模型炉内流场PIV测量研究
5.
Study on Cloth Hood Baffle of Circulating Fluidized Bed Boiler
循环流化床锅炉布风板风帽磨损研究
6.
The Arrangement of Secondary Air in Small and Middle Size CFB Boiler
中小型循环流化床锅炉二次风的布置
7.
Air Distributing Plate Improvement of JG-40/3.82-M Fluidized Bed Boiler
JG-40/3.82-M型流化床锅炉布风板改造
8.
Improvement of High-voltage Frequency Conversion for the Blower of Fluidized Bed Boiler
循环流化床锅炉风机的高压变频改造
9.
Practice of Primary Air Velocity On-line Computer Monitoring in Boiler
锅炉一次风流速微机在线监测的实现
10.
The Application of the HVC Speed Governing System on the Forced and Induced Draft Fans of the Power Station Boiler
高压变频调速装置在电站锅炉送引风机上应用
11.
Properties Analysis and Optimization of Primary Air Flow in Power Station
电站锅炉一次风量的特性分析与优化
12.
Measurement of the Mean Temperature Across the Section of Air Powdered-coal Mixture Pipe in Primary-air Conveying Powder System of Boiler;
锅炉送粉系统通过管外壁温度实现风粉混合物断面平均温度的测量
13.
a movable iron plate that regulates the draft in a stove or chimney or furnace.
火炉或锅炉中用以控制风量的可移动的金属板。
14.
Investigation on the Effect of the Ratio of Staged Air in the Total Air on HeatTransfer Difference on High-Temperature Heating Surfaces of a 600MW Supercritical Boiler
600MW超临界锅炉炉内分级送风比例对高温受热面热偏差影响的研究
15.
used to wrap around pipes or boilers or laid in attics to prevent loss of heat.
环绕水管或锅炉以防止热量流失。
16.
A Successful Reformon the Distribute Plate of the CFB
某电厂循环流化床锅炉布风板的风帽改造
17.
Analysis of the "blower pinch" of the primary air fan in CFB boiler
循环流化床锅炉一次风机“抢风”问题的分析
18.
Investigation of Flow Fields in Primary Chamber for 470t/h Circulating Fluid Bed Boiler;
470t/h循环流化床锅炉一次风室流场特性研究