说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 曲江大桥
1.
ERECTION SCHEME ANALYSIS OF SIMPLY-SUPPORTED STEEL TRUSS GIRDER OF QUJIANG MAJOR BRIDGE OVER YUXI TO MENGZI RAILWAY
玉蒙铁路曲江大桥简支钢桁梁架设方案分析
2.
Seisms Geological Enviroment Analysis and Site Selection of Qujiang Bridge in Yuxi-Mengzi Railway;
玉蒙铁路曲江大桥地震地质环境评价与桥址比选研究
3.
Structural Analysis and Strengthening of Two-Way Curved Arch Bridge of Nanjing Changjiang River Bridge After Fire Damage
南京长江大桥双曲拱桥火灾后结构分析与加固
4.
Survey Control in Construction of Curve Hanging Basket in Feiyunjiang Super Large Bridge
飞云江特大桥曲线挂篮过程中的测量控制
5.
Comparison of the Second Changjiang River Bridge in Wuhan with the Wuhan Changjiang River Bridge
武汉长江二桥与武汉长江大桥的比较
6.
Wuhan Yangtze River Bridge is the first bridge built over the River.
长江大桥是长江上修建的第一座桥。
7.
Jinjiangjinshajiang Bridge Dynamic Characteristics Analysis of Cable-Stayed Bridge;
金江金沙江大桥斜拉桥动力特性分析
8.
The Nanjing Yangtze River Bridge is as long as 6,700 meters.
南京长江大桥长达6,700米。
9.
The bridge stands majestic astride the river.
大桥巍然横跨在江上。
10.
In this paper, the construction of the deck surfacing of the Bridge is presented.
介绍巴东长江公路大桥桥面铺装情况。
11.
Study on Steel Deck Pavement Technology of Yichang Large Bridge over the Yangtse River
宜昌长江大桥钢桥面铺装技术的研究
12.
Analysis of Wuhu Changjiang River Bridge Deck’s Effective Width
芜湖长江大桥桥面板的有效宽度分析
13.
Static and Moving Load Experiment of the Constructed Hanjiang Super-major Bridge in Changjing Railway
长荆铁路汉江特大桥成桥静、动载试验
14.
Research of Trial Pavement Section for the Orthotropic Deck Plate of Runyang Yangtzi River Bridge;
润扬长江大桥钢桥面铺装试验段研究
15.
Design & Construction of Cable Changes of Qianwei Minjiang Cable-Stayed Bridge;
犍为岷江大桥斜拉桥换索设计与施工
16.
Research on Bank Slope Stability of Nujiang River Bridge in Zuogong, Xizang Province;
西藏左贡县怒江大桥桥台稳定性分析
17.
Research on Placement of Navigation Aids of the Zhongxian Yangtze River Bridge Area
忠县长江大桥桥区航标配布方案研究
18.
Study of Vertical Stiffness Limit for Main Bridge of Shanghai Changjiang River Bridge
上海长江大桥主桥竖向容许刚度研究