说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 中铁八局
1.
Research on Strategic Human Resources Management of the China Railway Group Eight;
中铁八局集团公司战略性人力资源管理研究
2.
Research on the Related Issue about the Development of Material Circulation Operation in China Railway Eighth Civil Engineering Group Cooperation Chengdu Bridge Factory;
发展中铁八局成都桥梁工厂物流业务相关问题研究
3.
Office Building of China Railway18th Bureau (Group) Co., Ltd Control Technology of the Whole Process of RC Overlong Structure's Jointless Design & Construction of High Rise Buildings
中铁十八局集团有限公司办公楼钢筋混凝土高层超长无缝结构设计施工全过程控制技术
4.
Operation of the system,formerly run by a government department, was vested in the Kowloon-Canton Railway Corporation (KCRC) in 1982.
当时铁路局是政府部门之一,一九八二年,铁路局由九广铁路公司接管。
5.
Study on the Construction Item Management of Yu-Huai Railway Undertaken by China Railway Erju Corporation;
中铁二局渝怀铁路施工项目管理研究
6.
During the period of "the eighth five-year plan" China's opening up to the outside world took on a new phase
“八五”期间中国对外开放出现新局面
7.
On the Meeting of the Political Bureau of the CPC Central Committee in March of 1938;
论一九三八年三月中共中央政治局会议
8.
The Study on Optimization of the Performance Appraisal System for Administrative Emploees of China Railway First Group Co,. Ltd
中铁X局局机关员工绩效考核体系优化研究
9.
An Analysis of Japanese Snatching Chinese Rights to Northeast Railway after "9.18" Incident
“九一八”事变后日本攫取中国东北铁路权探析
10.
Making Reinforcement Cast-iron for Oxygen Cycle Pond Construction in Bayi Steel
八钢制氧循环水池施工中加固铁件的制作
11.
The Sham Tseng Fire Station was also under construction and scheduled for completion in 1998.
深井消防局也在兴建中,预计于一九九八年落成。
12.
G8 Foreign Ministers Met in Canada to Discuss Mideast Situation
八国集团外长在加拿大开会主要讨论中东局势
13.
Study on the Strategic Diagnosis and Adjustement Tactics for the Eight Division of China Constuction Corporation;
中建八局战略诊断与战略调整策略研究
14.
The Synchro Project Cost Control Method Being under Construction Studies;
中建八局施工项目同步成本控制方法研究
15.
Eight Faults in The Collection of Yuanzhen Edited by China Publishing House;
中华书局版《元稹集》存在的八个主要问题略说
16.
Consummating the Financial Management System of China Railway Erju Group Corporation s BOT Project;
中铁二局BOT项目财务管理体系的完善
17.
Study on Green Marketing Strategies of China Railway First Group Co.,Ltd.;
中铁一局集团公司绿色营销策略研究
18.
Strive for a brand new era of China Iron and Steel Industry at the threshold of the new century;
面向新世纪 开创中国钢铁工业新局面