1.
Study on Cable Tension Optimization of Cable-stayed Bridge in Segmental Scaffold Construction Method;
支架节段现浇法斜拉桥索力优化研究
2.
Design and Construction Technology of the Cast-in-place Support at the Side-spans of a Continuous Rigid Framde Bridge
连续刚构桥边跨现浇段支架法设计及施工技术
3.
The Application of the Framework in the Building Construction of the Box-girder
支架法在海中箱梁现浇施工中的应用
4.
Cable Force Optimization of Cable-stayed Bridge Casting in Place on All Supported Framework and Definition of Construction Stage Cable Force
支架现浇斜拉桥索力优化及施工阶段索力确定
5.
Design and Construction of Cast-in-place Support in Large Length and Altitude and in Large Tonnage
大长度大高度大吨位现浇段支架设计与施工
6.
Construction of Cast-in-situ Box Beams Supported by Full Framing Born on Soft Ground
大面积软基上满堂支架法现浇箱梁施工工艺
7.
Cast-in-place Construction Technique Of Support Methods For Prestress Concrete Box Girder Continuous Beam
预应力砼箱型连续梁支架法现浇施工技术
8.
The Construction Method of Using Beret to Producing Cast-in Frames
用贝雷片制作桥梁现浇支架的施工方法
9.
The Cast-in Construction Method for Continuing Box Girder Holder Used in Nanning Bridge
南宁大桥连续箱梁支架法现浇施工技术
10.
The Design and Prefabrication of the Support Steel Pipe Scaffold for Cast-in-situ Prestressed Continuous Box Beam
预应力混凝土连续箱梁现浇段组合式高支架设计及施工技术研究
11.
Review of Segmental Assembling Construction Technique of Mobile Support
移动支架节段拼装施工技术方法综述
12.
Pre-camber Setting and Over-camber Control in In-situ Casting of Simply-supported Box Beam with Bracket Method
支架法现浇简支箱梁预拱度设置及起拱控制浅谈
13.
On construction technique of moving support cast-in-place 900 t simple box girder
移动支架现浇900t简支箱梁施工技术
14.
Discussion on the pouring method of 32 m box beam without middle pillar and bearer
中间无支柱支架浇筑32m箱梁方法探讨
15.
Research on Design Calculation of Full Hall Scaffold Method of Cast in Place Continuous Box Girder for Ha-Da Special Railway Line for Passenger Transport Spanning Shen-Bei Avenue
哈大客专跨沈北大道现浇连续箱梁满堂支架法设计计算研究
16.
Application of Pier-beam Support Method in Cast-in-place Box Beam Construction of a Sea-crossing Bridge
墩梁式支架法在某跨海大桥现浇箱梁施工中的应用
17.
Design and Construction of Supporting Frame for Casting Box Girder Bridge
时令河大桥箱梁现浇支架设计与施工
18.
Technique on Construction Frame and Platform for Cast-in-place Beams
现浇梁施工支架及作业平台搭设技术