1.
Large-span Steel Truss Tied Arch Bridge Construction Process Control Research of Key Technologies;
特大跨钢桁系杆拱桥施工过程控制关键技术研究
2.
Construction Control Method of Long-Span Steel Box Tied Arch Bridge
大跨度钢箱系杆拱桥的施工控制方法
3.
The Construction Technology of CFST Rib of Frame Tied Arch Bridges;
刚架系杆拱桥钢管混凝土拱肋施工技术
4.
Control Techniques in the Construction of the Arch Rib for CFST Tied Arch Bridge
钢管混凝土系杆拱桥拱肋施工控制技术
5.
Construction Stability Analysis of Long-Span Steel Box Truss Arch Bridge;
大跨度钢箱桁架拱桥施工稳定性分析
6.
RESEARCH ON DESIGN AND CONSTRUCTION TECHNOLOGY OF PROTECTION SYSTEM FOR BALLASTED STEEL BRIDGE DECK OF STEEL TIED ARCH BRIDGE OVER FUZHOU-XIAMEN RAILWAY
福厦铁路钢系杆拱桥有砟钢桥面防护体系设计与施工工艺研究
7.
Construction control of the high fluidity concrete on tied steel arch bridge
大流动性混凝土在系杆钢管拱桥中的施工控制
8.
Construction Control of Concrete Lifting for Steel-pipe Concrete Bowstring Arched Bridge
钢管混凝土系杆拱桥混凝土顶升的施工控制
9.
Design and Construction of the Principal Span 120 m CFST Through Type Brace Arch Bridegs
主跨120m钢管混凝土下承式系杆拱桥设计及施工
10.
Research on Construction Methods for Basket-Type Tie-Bar Ach Bridge of Steel Piped Concrete
钢管混凝土提篮式系杆拱桥施工方法研究
11.
Design and Construction of the Steel Truss Arch of Qi Xing Guan Arch Bridge;
七星关大桥贝雷钢桁拱架的设计与施工
12.
Structure Analysis of Arch Rib of Long Span Tied Concrete-Filled Steel Tubular Arch Bridge During Construction Procedure;
大跨度钢管混凝土系杆拱桥主拱肋施工过程结构分析
13.
Determination of Reasonable Finished State and Reasonable Construction State of Special-Shaped Tied-Arch Bridge;
钢筋混凝土异型系杆拱桥合理成桥状态与合理施工状态研究
14.
Tube Friction Factors Determination and Construction Control of Concrete-filled Steel Tube Simply Supported Tied-arch Bridge
钢管混凝土简支系杆拱桥管道摩阻系数确定及施工监控
15.
Static Load Experimental Investigation to Model of Long Span Continuous Steel Truss Tied Arch Bridge;
大跨径连续钢桁系杆拱桥静力模型实验技术研究
16.
The Stability and the Ultimate Load-Carrying Capacity Study on the Steel-Tube Truss Rib Arch Bridge;
空钢管桁肋式系杆拱桥结构稳定与极限承载力研究
17.
Dynamical Characteristics of Arch Bridge Without Thrust and Analysis of the Train Running Safety
无推力式钢桁系杆拱桥动力特性及列车走行性分析
18.
Research on Displacement of Piers of Concrete-filled Steel Tubular Tied Rigid Frame Through Arch Bridge on Construction Stages;
下承式钢管混凝土刚架系杆拱桥施工阶段主墩变位的研究