1.
Digital Simulation and Optimization for an Railway Production Line in an Iron and Steel Enterprise;
钢铁企业轨梁生产线数字建模与仿真研究
2.
Study on Simulation and Application for an Trick-Beam Production Line in an Iron & Steel Enterprise;
钢铁轨梁万能生产线仿真系统研究及应用
3.
Study on Utilization of PLC Control Network in Beam and Rail Mill of Panzhihua Iron & Steel Group Company;
基于现场总线的PLC控制网络在攀钢轨梁厂自动化生产线的应用
4.
Baogang Rail and Beam Plant Universal Mill Production Line Dynamic Reactive Power Compensation and Harmonic Suppression;
包钢轨梁万能轧机生产线动态无功补偿及谐波抑制
5.
Study of Monorail Transit Emergency Beam's Bearing and Superelevation and Error Analysis of Track Beam Production Formwork
单轨交通应急梁支座与超高研究以及轨道梁生产用模板误差分析
6.
Applying of Continuous Steam Curing Technology in Straddle-type mMonorail Transit PC Track Beam in Winter
延续蒸养工艺在跨座式单轨交通PC轨道梁冬季生产中的应用
7.
Research on Design of the 40.5 m Steel Track Girder for Line 2 of Chongqing Light Rail
重庆轻轨2号线40.5m钢轨道梁设计研究
8.
National Rail on High-Speed Railway and Process Technology Recommendation
国内客运专线用钢轨及其生产工艺介绍
9.
Analysis of Corrosion on Local Position of Supporting Beam of Accumulator Tank in Decompression Tower
减压塔三线集油箱支撑梁局部产生腐蚀原因
10.
Technique Research on welding "H" type longeron;
大型焊接工字梁车架生产线的工艺研究
11.
Forming Machine Roller Beam Verification for Steel Pipe Production in the Second West to East Gas Pipeline Project
生产西气东输二线钢管成型机辊梁的校验
12.
It makes a scrutiny to explain the feasibility of track beam support manufactured at home.
以说明轨道梁支座的国产化是可行的。
13.
Preliminary Study of Maintenance Management System of Rail Beam Bridge in Chongqing Monorail Transit Line 2;
重庆轨道交通2号线轨道梁桥养护管理系统初步研究
14.
The Construction Problem of the U-shaped Girder of the No.6 Rail Transit of Shanghai;
上海轨道6号线槽形梁施工若干问题研究
15.
Construction Technology of Mechanical Pavement & Bridge Erection on Electrical Double-Track Railway;
电气化铁路增建二线机械铺轨架梁施工技术
16.
Seven box beams erection of the forth line on ZH-1 section of Guang-Zhu intercity track traffic project
广珠城际轨道交通工程ZH-1标四线七箱梁架设
17.
The crack repairing technology of unballasted track and bridge covering layer of special railway line for passenger transportation
客运专线无砟轨道与桥梁保护层裂缝修补技术
18.
Accroding to the great hidden trouble of bearing beam of sleeper and platform for cokeblock carrige, the paper puts forward the rebuilding project and construction measurement without influencing the production of coke furnace.
针对拦焦轨道支承梁及平台存在的重大隐患,提出了不影响焦炉生产的大修方案和施工措施。